Similar Projects
2021 Stormwater and Street Improvements
Bidding
McFarland, WI

2021 Road Maintenance
Bidding
$280,000 to $340,000 est. value
Middleton, WI

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

East Side Interceptor and MMSD PS 17 Force Main Relief Phase I
Results
Less than $8,800,000 est. value
Verona, WI

Road Work
Bidding
Verona, WI

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Chip Seal
Bidding
WI

Village of Dane Southeast Public Works Loop
Post-Bid
Dane, WI

Crack Routing and Sealing
Results
Madison, WI 53703

New Glarus - Verona, South County Line - Gehin Street
Bidding
New Glarus, Verona, WI

Sewer Cleaning and Multi Sensor Inspection for the Pumping Station 16 Force Main
Post-Bid
Madison, WI

CIPP Rehab of Sanitary Sewers
Results
$1,141,590 est. value
Madison, WI 53703

Last Updated 01/22/2021 12:05 AM
Project Title

Cedar Street Assessment District - 2021 And South Street, High Street, And West Wingra Drive Assessment District - 2021

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,348,305
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of sanitary sewer main, laterals, water main and services, storm sewer structures and pipes, excavation, base preparation, curb and gutter, asphalt pavement, sidewalk, driveway aprons, pavement marking. The project limits for the work to construct the extension of Cedar Street are from South Street to South Park Street. Cedar Street is approximately 775 LF in length. The construction of the medians along South Park Street at Cedar Street. The South Park Street median improvements are approximately 500 LF in length. The reconstruction limits for South Street and High Street are from West Wingra Drive to Midland Street and the Cul-De-Sac to South Street, respectively. South Street and High Street are approximately 1,700 LF and 450 LF in length, respectively. The resurfacing limits for West Wingra Drive are from Fisch Hatchery Road to South Street. West Wingra Drive is approximately 650 LF in length.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents