Similar Projects
Andover High Central Heating Plant Upgrade - SCH-5 - Town of Andover -
Renovation, Alteration
Conception
$800,000 est. value
Andover, MA 01810

Andover High School - Collins Center - Install New Roof Top Units - FAC-7 - Town of Andover
Alteration
Conception
$500,000 est. value
Andover, MA 01810

Replacement of Roof Top Heating and Ventilation Unit
Renovation
Sub-Bidding
$100,000 CJ est. value
E Harwich, MA 02645

Replace Roofing System RTI HQ 5222 - Sub Bids
Post-Bid
$2,100,000 est. value
Mashpee, MA 02649

Air Cooled Chiller Replacement
Term Contract
Post-Bid
Falmouth, Woods Hole, MA 02543

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Owner's Project Manager for Replacement Heating Ventilation and Air Conditioning (HVAC) System for Yarmouth Police Station
Results
Yarmouth, MA 02673

West Middle Air Conditioning - Town of Andover
Alteration
Conception
$4,200,000 est. value
Andover, MA 01810

Purchase and Installation of One Heating Pump
Alteration
Post-Bid
Mill River, MA

Gymnasiums Air Handler Replacement Project
Results
Less than $682,000 est. value
Andover, MA 01810

Heating, Ventilation and Air-Conditioning Upgrades - Pittsfield High School
Alteration
Conception
$500,000 est. value
Pittsfield, MA 01201

Installation of New HVAC Equipment for the Sandwich Hollows Clubhouse
Alteration
Post-Bid
Sandwich, MA 02537

Repair HVAC B5238
Results
$400,000 est. value
Sandwich, MA 02542

Modify Parachute Readiness Center - Sub-Bids
Alteration
Post-Bid
$520,000 est. value
Mashpee, MA 02649

Roof Replacement and Associated Work at The Community Elementary School - Sub Bid
Results
$1,400,000 est. value
North Attleborough, MA 02760

Reported 12/15/2022 12:00 AM
Project Title

Whitmore Hall Mechanical Improvements Phase II (Re-Bid) - Sub bid

Physical Address View project details and contacts
City, State (County) Amherst, MA 01002   (Hampshire County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding,
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Whitmore Hall Mechanical Improvements Phase II Rebid All Sub-Bidders must be certified by DCAMM for the category of work for no less than the filed sub bid price and must submit with their bid, a valid DCAMM Certificate of Eligibility of Sub Bidders in the trade for which they are bidding, along with a valid DCAMM Update Statement. The work shall be completed on or before 08/25/2023 from the Notice to Proceed and in general the Project includes: Replace original fire dampers at main duct risers. Approximately 26 locations. Minimum rates of wages to be paid on the project have been determined by the Commissioner of Labor & Workforce Development under the provisions of Sections 26 & 27, Chapter 149 of the General Laws. Wages rates are listed in the contract form portion of the specification book. Each General Bid proposal must be secured by an accompanying deposit of 5% of the total bid. Deposits shall be in the form of a BID BOND, TREASURER'S or CASHIER'S CHECK payable to the University of Massachusetts. Deposits shall be returned in accordance with the law. SECTION 230001 SUB-TRADES HVAC All Bid Deposits $ (5% of Bid Amount) Sub-bids Submitted Under Chapter 149, Section 44f, Which Are Restricted to the U.s. By One Contractor, Which Are Deemed to Be Unrealistic in That the Price Proposed is, in the Judgement of This Awarding Authority, Substantially Less or More Than the Actual Cost to Complete All of the Work Specified in That Section of the Specifications Will Be Considered as Not Responsive to the Invitation to Bid and Shall Be Rejected. (Department of Labor & Workforce Development Ruling #136 & #169). All bids for this project are subject to the provisions of either or both Massachusetts General Laws, Chapter 30, Section 39M as amended and Massachusetts General Laws, Chapter 149, Sections 44A 44I inclusive. The Awarding Authority reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Designer: Architectural Engineers Inc **Sub Bid Date and time (12/14/2022 at 12:00 PM ET) The project generally consists of a partial replacement of an office building's fire dampers. The building shall be designed and constructed so as to meet all requirements of the Massachusetts State Building Code, current edition, in addition to all other applicable codes and regulations. b. The building, which will house UMA functions is a 3-story structure, of Construction Classification IIA, for Use Group B. Functional building areas include offices, conference rooms, building lobby, common corridors, elevator cores, cafeteria/kitchen and public toilets, building supervisory offices, and mechanical/electrical utility areas housing building equipment. The work will include all operations necessary to deliver the building(s) and ancillary on and off site amenities in a fully installed and operable condition including all utility and site work and obtaining all necessary licenses, permits, and certificates. Where utilities exist within and adjacent to the building(s) and ancillary parking lots, and are known by the Owner, they have been shown on the site plan(s) appearing in, but not restricted to, the exhibits. Connections to these existing utility lines will be the responsibility of the General Contractor. C. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Construction including, but not limited to: a. Phased replacement of fire dampers. This shall include demolition, new fire dampers, rework to existing fire dampers, new access doors, new fire rated gypsum board enclosures, repair to masonry walls, installation of new ductwork, etc. b. Relocation or removal and reinstallation of piping, conduit, lights, sensors, etc. to facilitate the work. c. Abatement of hazardous materials.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents