Similar Projects
Berwick Area YMCA
New Construction - 8,000 SF
Conception
$3,300,000 est. value
Berwick, PA 18603

RV Parking Expansion
Addition
Design
West Chester, PA 19382

College Avenue and Heister Street Sidewalk and Utility Upgrades
Renovation
Post-Bid
$662,219 est. value
University Park, PA 16802

Sidewalk Replacment
Post-Bid
Meadville, PA 16335

New Brighton CDBG - ADA Curbs Phase 6
Results
Less than $43,552 est. value
Beaver, PA

KCAC Parking Lot Improvements
Results
$35,000 to $690,000 est. value
Indiana, PA 15705

Greentree Industrial Park - Truck Parking
New Construction
Construction
Alburtis, PA 18011

Handicapped Parking and Infield Access Tunnel
Construction
Port Royal, PA 17082

Westmont Hilltop School District - Phase 2
Post-Bid
Johnstown, PA 15905

2020 Whitemarsh Township Intersection Improvements Program
Results
Lafayette Hill, PA 19444

Repaving, Concrete Sidewalk and Loading Dock Replacement at the Brentwood Middle/High School
Post-Bid
Pittsburgh, PA 15227

2020 Penn Vale ADA Improvements Project
Results
Barbours, Williamsport, PA 17701

Brownsville Road Streetscape Project
Post-Bid
Mount Oliver, PA 15210

French Street Improvement Project
Results
Farrell, PA 16121

Meadowcroft Park ADA Access Phase 2
Post-Bid
Mount Lebanon, PA 15228

Reported 10/28/2021 12:00 AM
Project Title

Building ADA Accessibility Project

Physical Address View project details and contacts
City, State (County) Olyphant, PA 18447   (Lackawanna County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to reconstruct and reconfigure a structurally failing and deteriorated handicap ramp and railings allow safe passage for the disabled for residents needing to do business within Olyphant Borough Building. The project will include the removal of the deteriorated switchback designed wooden ramp, wooden steps, and supports. The entire structure will be replaced with new stairs and steps, metal non-slip treads, and an ADA Handicap Lift. A new entrance will be constructed, and the existing platform and deck made of wood needs to be replaced with metal steps and decking to accommodate the latest ADA Standards.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents