Similar Projects
UMSL Science Complex Chilled Water
Alteration
Bidding
$526,000 est. value
Beverly Hills, MO 63121

HVAC System Cleaning Group 2 Schools
Alteration
Bidding
Saint Louis, MO

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Cypress Swamp HVAC Replacement 2021
Results
Saint Louis, MO

Cooling Tower and Closed Systems Water Treatment
Alteration
Results
MO

HVAC System Cleaning - Group 4 Schools
Alteration
Bidding
Saint Louis, MO

Miriam Academy HVAC Replacement
Alteration
Post-Bid
Saint Louis, MO 63132

Penguin Puffin Coast HVAC Improvements Project
Alteration
Results
Saint Louis, MO 63110

HVAC System Cleaning - Group 3 Schools
Alteration
Bidding
Saint Louis, MO

HVAC, On-Call Maintenance and Repair Service
Term Contract
Post-Bid
Crestwood, MO

2021 Hazelwood Temperature Controls System Project
Alteration
Results
Hazelwood, MO 63042

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

Saint Louis Zoo Sears Lehmann, Jr. Wildlife Reserve Walk-in Freezer
Alteration
Results
Saint Louis, MO

Saint Louis VAMC Fire Extinguisher Inspection and Certification
Term Contract
Post-Bid
Jacksonville, Shiloh, IL - Creve Coeur, Florissant, O'Fallon, Saint Louis, Washington, MO 63110

Last Updated 06/01/2022 11:14 PM
Project Title

City Hall Furnace Replacements

Physical Address View project details and contacts
City, State (County) Clayton, MO 63124   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the replacement of (5) furnaces located in the Ladue City Hall Building. Replace five (5) 30+ year-old furnaces located in the City Hall Attic that service multiple spaces. • New Units are to be of an efficiency rating of 96% or better • New models should have heat capacities matching existing (80k btu and 120k btu) • Existing A-coils are newer and utilizing 410-A refrigerant and will remain • Fabricate and install ductwork to connect to existing supply, return plenums and filter Boxes • Connect to existing gas, electric and flue piping • Mechanical permits are required through the City however fees shall be waived • Remove old units and haul away (can be dumped in the City scrap bin) • Provide and install new programmable thermostats • Start and test for proper operation

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents