Similar Projects
Orange Center Boulevard Sanitary Improvements
Bidding
Less than $1,850,000 est. value
Orlando, FL 32805

Lift Station Replacement And Sewage Pipe Replacement at Maxwell Terrace Apartments
Post-Bid
$253,000 est. value
Orlando, FL 32805

Oakland Wastewater Collection and Transmission System
Post-Bid
$569,722 est. value
Oakland, FL

Construction Manager at Risk Park, Utility, Trails and Other Public Projects
Results
FL

Parks Camp Joy Sewer and Sanitary Force Main
Results
Less than $440,000 est. value
Apopka, FL 32712

Grease Traps Cleaning Services
Term Contract
Post-Bid
Less than $10,000 est. value
Orlando, FL 32802

Wastewater Services
Results
FL

Gravity Main CIPP Lining Term Contract
Term Contract
Results
Less than $400,000 est. value
FL

Gravity Package No. 31
Results
$703,401 est. value
FL

Raleigh Street Sanitary Sewer Replacement
Results
Less than $1,800,000 est. value
Orlando, FL

Lateral CIPP Lining
Term Contract
Results
Less than $450,000 est. value
FL

Gravity Package No. 28
Results
$2,559,427 est. value
FL

Gravity System Improvements
Results
$4,100,000 est. value
FL

Gravity Package No. 28
Results
$2,559,427 est. value
FL

Magnolia Park and Eco Tourism Utility Extension
Results
$550,000 est. value
Apopka, FL 32703

Last Updated 04/09/2019 08:37 AM
Project Title

9th Street Gravity Sewer, Force Main and Water Main Improvements

Physical Address View project details and contacts
City, State (County) Winter Garden, FL 34777   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project is for construction of new gravity sewers, force mains and water mains on 9th Street and adjacent roads. The project includes furnishing all labor, materials, equipment, restoration, and incidentals to construct the new mains by both open trench, jack and bore, and directional drill construction methods and connecting to existing mains and services. Removal and abandonment of existing mains is also included, as well as, bypass operations, maintenance of traffic (MOT), temporary erosion and sediment control and full restoration activities to include, but not limited to, asphalt pavement, sidewalks, curbing, landscaping, malboxes, fences, and signage.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents