Similar Projects
The Dairy Residential Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Orchard Homes, MT 59804

The Dairy Residential Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Orchard Homes, MT 59804

McCormick Park and Community Center - City of Missoula
Addition, Demolition, Infrastructure
Design
$27,000,000 CJ est. value
Missoula, MT 59801

Historical Museum at Fort Missoula Alien Detention Center Barracks
New Construction, Renovation, Infrastructure
Design
$691,100 CJ est. value
Missoula, MT 59804

Chip Sealing and Site Improvements of the McNamara/Johnsrud Roads
Infrastructure
Bidding
$1,000,000 CJ est. value
Missoula, MT 59802

Chip Sealing and Site Improvements of the McNamara/Johnsrud Roads
Infrastructure
Bidding
$1,000,000 CJ est. value
Missoula, MT 59802

Montana Museum of Arts Culture Building Site Work Project
Infrastructure
Post-Bid
Missoula, MT 59812

Salmon and Placid Lake State Parks Chip Seal and Re-stripe
Infrastructure
Post-Bid
$80,000 est. value
Seeley Lake, MT 59868

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

Grant Creek Village
New Construction, Infrastructure
Construction
$190,000,000 CJ est. value
Missoula, MT 59808

National Museum of Forest Service History
LEED Certification, New Construction, Infrastructure - 30,000 SF
Pending Verification
$10,500,000 CJ est. value
Missoula, MT 59808

Mullan Road Reconstruction - City of Missoula
Infrastructure
Pending Verification
$13,000,000 CJ est. value
Missoula, MT 59808

South Avenue Improvements (Reserve to 36th) - S-19 - City of Missoula
New Construction, Infrastructure
Conception
$4,200,000 CJ est. value
Missoula, MT 59804

Pontiac Commercial Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Missoula, MT 59808

Last Updated 05/01/2023 11:36 AM
Project Title

George Elmer Drive/Cattle Drive Roundabout Project

Physical Address View project details and contacts
City, State (County) Missoula, MT 59808   (Missoula County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 1, 2023, a design engineer has been selected. No timeline has been established for the construction. *The previous solicitation is listed below for reference This Project will finalize the design and then complete the remaining roundabout construction improvements at the George Elmer Drive / Cattle Drive intersection. Additional design and construction features to be completed include splitter/pedestrian refuge islands, height reduction of the existing water feature in the west leg of the intersection, bike lane jump offs (from the-on street bike lanes to the widened sidewalks and back onto the on-street bike lanes), lighting, landscaping, center island and surrounding truck apron. These features will be incorporated into the Project and will be informed by the design of the Mullan BUILD Grant Project infrastructure leading up to and including this intersection. Questions regarding the RFP and Project should be directed to Kevin Slovarp, City Engineer of Surface Transportation, City Hall, 435 Ryman Street, Missoula, MT 59802-4297, kslovarp@ci.missoula.mt.us, by calling (406) 552-6099 or (406) 529-6596. The method of contractor selection has not been determined at this time.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents