Similar Projects
Roof Repair / Replacement at Palm Lake Village Apartments
Alteration
Bidding
Dunedin, FL 34698

Roof Replacement at Omega Apartments
Post-Bid
Orlando, FL 32810

Air Duct Cleaning Services
Term Contract
Post-Bid
Orlando, FL 32827

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Y1JZ-- Project # 675-20-113 - Lakemont Roof Maintenance - Replacement
Results
Orlando, FL 32827

Take 5 Oil Change
Renovation - 1,500 SF
Construction
Orlando, FL 32803

RBELC HVAC Server Room Renovations
Post-Bid
Orlando, FL 32800

Orange County Corrections Phoenix Chiller Replacement
Results
Less than $645,000 est. value
Orlando, FL 32839

HVAC Mechanical Services
Term Contract
Post-Bid
Orlando, FL 32802

City-Wide Air Conditioning and Heating Maintenance
Term Contract
Results
Ocoee, FL 34761

Roof Coating of Florida Highway Patrol(Fhp)Troop K Building #4715 Lake Worth, Florida`S Turnpike Mainline(Sr 91), Milepost 94.0
Post-Bid
Greenacres, FL 33467

Unit 1 Boiler Building Roof Replacement
Results
Orlando, FL 32831

Roof Replacement of Five Residential Properties
Post-Bid
Orlando, FL 32800

Construction Management at Risk for Piedmont Lakes Middle School HVAC System Replacement Project
Results
Less than $5,200,000 est. value
Apopka, FL 32703

Residential Roofing Work
Post-Bid
Orlando, FL 32800

Last Updated 03/18/2022 06:23 AM
Project Title

Rogers Kiene HVAC and Roof Replacement

Physical Address View project details and contacts
City, State (County) Orlando, FL 32801   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist in the replacement of existing HVAC system and roof. Structural modifications to building for added strength. To provide complete, finished, watertight, high wind resistant, hail resistant, and fully warranted roofing installation along with other work such as replacement and installation of new thru-wall scuppers and overflows, addition of personnel guard on new roof hatch, and removal, reinstallation or replacement, repair of existing historic elements (turret roofing, finial, acroterion), installation/patch of new skylights, installation of new parapet ladder and installation of new roof roof access ladder from the 2nd Floor Studio. Mechanically, this project also includes the demolishing and replacement of all rooftop air handing units and slipt system air handing units along with their associated condensing units. All duct work to ensure new systems fit into the context of the building. Electric scope for this project includes providing power to all new equipment. Structural scope for this project includes bracing of existing wood members to support new roofing material and new mechanical equipment, analysis of turret structure once roof has been removed, and bracing of First Floor columns.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents