Similar Projects
2021 Roadway Resurfacing
Bidding
Orange Beach, AL

Baldwin County Resurfacing Projects 2020: Group 2
Post-Bid
AL

Roadway Improvements
Post-Bid
$195,000 to $225,000 est. value
Elberta, AL 36530

Southern Region Disaster Recovery Support BPA
Results

Citywide Road Resurfacing and Striping Project
Results
Less than $406,226 est. value
Fairhope, AL 36533

Resurfacing 2020
Post-Bid
Foley, AL

Provision of Labor and Equipment for Asphalt Placement
Results
Bay Minette, AL

FY 2020 Street Resurfacing
Post-Bid
Daphne, AL 36526

Construction of Street Widening/Bike Lanes and Resurfacing
Results
Less than $653,441 est. value
Gulf Shores, AL 36547

Resurfacing of Various Roadways
Post-Bid
Elberta, AL 36530

ADA Transition Plan Improvements within Baldwin County Row Phase II
Results
Less than $178,831 est. value
Bay Minette, AL 36507

Constructing the Planing, Resurfacing, Steel Blockout Replacement, and Traffic Stripe
Results
$2,691,921 to $3,290,125 est. value
AL

Constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-181 from the Junction of SR-42 (US-98) West of Barnwell to just South of the Junction of Quail Creek Drive in Fairhope
Results
$1,486,034 to $1,816,264 est. value
AL

Bay Minette Transportation Facility Resurfacing and Parking Improvements
Results
Bay Minette, AL 36507

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (Us-31) from the Junction of Crosby Road in Bay Minette to the Escambia County Line
Results
$1,982,091 to $2,422,555 est. value
AL

Last Updated 11/20/2019 07:09 AM
Project Title

Baldwin County Resurfacing Projects 2020: Group #1

Physical Address View project details and contacts
City, State (County) Bay Minette, AL 36507   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated total tonnage of bituminous plant mix for Group 1 is 19,312 tons. Details concerning these roads and a map of their locations are included within the Contract Documents. The construction start date will be on or about January 1, 2020. If the Contractor wishes to begin work early, approval from Baldwin County must be obtained first. FORTY-FIVE (45) WORKING DAYS are allowed for the construction of the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents