Similar Projects
Last Updated | 10/21/2021 12:14 PM |
Project Title | 30-Inch Transmission Main Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Evanston, IL (Cook County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work on this project includes the installation of approximately 6,901 linear feet of 30-inch diameter cured in place pipe (CIPP) liner, 512 liner feet of directionally drilled 6-inch water main, 1,402 linear feet of ductile iron pipe water main installed by open cut ranging from 6-inch to 30-inch diameter in size, 239 linear feet of combined and storm sewer ranging from 10-inch to 12-inch diameter in size, related appurtenances, concrete curb and sidewalk repairs, pavement patching, hot mix asphalt (HMA) street resurfacing, parkway restoration. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |