Similar Projects
Sioux Falls DOT Office
Addition
Bidding
Sioux Falls, SD 57107

Watertown Area Community Foundation Plaza
New Construction
Bidding
$2,500,000 est. value
Watertown, SD

Open Air Structures and Accessory or Utility Buildings
Post-Bid
SD

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Cottages ADA Restrooms - SD Developmental Center
Results
Redfield, SD 57469

Miscellaneous Improvements Projects, General Civil Projects
Results
$2,000,000 est. value
Rapid City, SD

B-21 Low-Observable Restoration Facility (Lo Hangar)
New Construction
Post-Bid
Ellsworth AFB, SD

Waubay Storm Shelter
Results
Waubay, SD 57273

GAOA Alt/Repair Construction Services MATOC
Renovation
Post-Bid

Falls Park Visitor Center Improvements
Alteration
Results
$696,000 est. value
Sioux Falls, SD 57104

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Public Safety Training Campus
New Construction
Results
$37,342,445 est. value
Sioux Falls, SD

Belle Fourche Area Lab
New Construction
Results
Belle Fourche, SD 57717

EY Berry Library and Learning Center Renovation (Bathrooms)
Renovation
Results
Spearfish, SD

Last Updated 11/23/2021 04:16 PM
Project Title

Salem DOT West Bound Rest Area Remodel

Physical Address View project details and contacts
City, State (County) Salem, SD   (McCook County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the Extensive remodel of existing rest area as well as site updates.

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents