Similar Projects
Repair Runway Pavements
Design
$25,000,000 to $100,000,000 est. value
East Gaffney, SC

Greenville Spartanburg International Airport (GSP) Airfield Pavement Improvements Program - Priority 1
Post-Bid
Greer, SC 29651

CHS Miscellaneous Airfield Pavement Repairs
Post-Bid
North Charleston, SC 29418

Airport Taxiway and Apron Reconstruction
Results
$250,000 to $500,000 est. value
Saluda, SC 29138

Taxilane and Apron Rehabilitation at Barnwell County Airport
Results
Barnwell, SC 29812

New Connector Taxiway Project
Post-Bid
Walterboro, SC 29488

Chester Catawba Regional Airport Taxiway Pavement Rehabilitation
Results
Less than $1,014,610 est. value
Chester, SC 29706

Hanger Taxilane Rehabilitation
Post-Bid
Chester, SC

Southwest Apron Expansion
Results
Orangeburg, SC 29115

Spartanburg Downtown Memorial Airport (Spa) - Taxiway A Rehabilitation Project
Infrastructure
Post-Bid
Spartanburg, SC

Summerville Airport Apron Expansion Project
Results
Saint George, SC 29477

Main Apron Expansion – Phase 1
Infrastructure
Post-Bid
Orangeburg, SC 29115

Construction of Hartsville Regional Airport FBO Terminal
Results
Hartsville, SC

Perimeter Guard Shack Upgrade
New Construction
Post-Bid
Columbia, SC

Orangeburg Municipal Airport Expansion Project
Results
Orangeburg, SC 29115

Last Updated 09/27/2021 09:14 AM
Project Title

Rubber Removal and Paint Stripping

Physical Address View project details and contacts
City, State (County) North Charleston, SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project consists of furnishing all labor, equipment, materials, transportation, supervision and testing to accomplish rubber removal and paint striping on all runways, taxiways, and associated pavements. Work to be performed shall include, but not be limited to: rubber removal by water-blasting, shot-blasting, sandblasting or chemical means, removal of painted markings, removal of joint sealant materials, re-facing of joint sealant reservoirs, application of airfield painted markings, application of self-leveling silicone, tooled silicone & preformed neoprene joint sealants, and incidental related work.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents