Similar Projects
New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

Sewage Treatment Plant Bulkhead Repair
Bidding
$25,000 est. value
Jamaica Beach, TX

Hankamer - 0.3 MGD Wastewater Treatment Plant Project
New Construction
Bidding
Hankamer, TX

Berry Creek Highlands - Phase I
Post-Bid
Georgetown, TX 78746

Wastewater Treatment Plant Clarifier No. 1
Post-Bid
TX

Pine Gully Wastewater Treatment Plant - Phase 1A
Results
$3,000,000 to $3,200,000 est. value
Seabrook, TX 77586

Waste Water Plant Maintenance and Repair
Results
Less than $50,000 est. value
Von Ormy, TX 78073

1.30 MGD WWTP New Headworks, Mechanical Screen and Aeration Basin Improvements
New Construction
Bidding
$737,000 est. value
Houston, TX 77069

Construction of Wastewater Treatment Plant for Big Sky Estates Phase 1
Post-Bid
Less than $1,000,000 est. value
Denton, TX 76201

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

2020 CDBG WWTP Improvements
Renovation
Bidding
$340,000 est. value
Sweeny, TX

Bayview Mud WWTF Blowers Replacement
Post-Bid
Bacliff, TX 77518

Hitchcock Wastewater Treatment Plant Oxidation Ditch Dredging and Solids Removal and Disposal
Results
Less than $151,400 est. value
Hitchcock, TX 77563

Wastewater Treatment Plant No. 1 - Phase 3 (0.45 MGD) and Lift Station No. 1 - Phase 3
New Construction
Bidding
TX

Last Updated 08/26/2021 02:44 PM
Project Title

CRWS DCURD Outfall 002 Improvements

Physical Address View project details and contacts
City, State (County) TX   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,009,565
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Relocate diversion point for Outfall 002 and install a new pipeline at the end of the chlorine contact basins. Furnish and install two (2) 30” motor actuated butterfly valves in chlorine contact basins 1 and 2. Demolish and remove all carbon adsorption equipment and media in Carbon Adsorption Bed No. 9. Convert Carbon Adsorption Bed No. 9 to dechlorination channel and Post Aeration Basin No. 1. Retrofit bed 9 with all hydraulic and structural modifications to convert to post aeration basin. Furnish and install one (1) new positive displacement blower with a fine-bubble membrane diffuser system at Post Aeration Basin No. 1. Furnish and install one (1) sulfonator in slot 7 in the Dechlorination Building. Connect to the common header leaving the evaporators. Furnish and install one (1) sulfur dioxide ejector and injection quill. Furnish and install electrical and instrumentation. Furnish Process Control System (PCS) programming and testing.

Details

Division 03 - Concrete, Precast Concrete.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 31 - Earthwork, Earthwork Methods.
Division 44 - Pollution and Waste Control Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents