Similar Projects
Skiff Point
New Construction
Design
Clearwater, FL 33767

Grady Brown Park Phase III Improvements
Renovation
Bidding
Freeport, FL 32439

Design-Build-Finance Services for North Bulkhead Berths 1-6 Realignment
Infrastructure
Bidding
$300,000,000 est. value
FL

Longwood/Poquito Bayou Park Dock Extension
Post-Bid
Shalimar, FL 32579

Macdill AFB Marina Wet Slip Repair
Post-Bid
Macdill AFB, FL

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Latitude Margaritaville Watersound Amenities, Phase 1 & 2
New Construction - 34,862 SF
Construction
$30,000,000 est. value
WaterSound, FL

Lee County Boat Ramp Repair
Infrastructure
Bidding
Fort Myers, FL 33905

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Results
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Pelican Harbor Marina - Wave Attenuator Replacement
Infrastructure
Bidding
$735,200 est. value
Miami, FL 33138

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

Last Updated 11/18/2021 01:23 PM
Project Title

Hidden Pond Preserve Observation Pier

Physical Address View project details and contacts
City, State (County) Orlando, FL 32833   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $158,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a public use pier with observation deck along west shore of Hidden Pond, and the minor grading of a path connecting existing trail to the pier.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents