Last Updated | 06/29/2023 01:19 PM |
Project Title | Fire Suppression System Renovation MEP |
Physical Address | View project details and contacts |
City, State (County) | Mount Horeb, WI 53572 (Dane County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $740,073 [brand] Estimate |
Plans Available from | Consultant |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of installing a fire suppression systems through the entire building. The new system will be a pre-action sprinkler system. A nitrogen generator will supply supervisory gas to the pre action system. A new water service will be installed to feed the new fire suppression systems. Existing plumbing will be connected to the new water service. A new fire alarm system will be installed through the entire building. System will include smoke detection system, a heat detector system in warehouse, audio/visual devices, and alarm panels. The existing apartment, located above the mezzanine, will be removed to allow for more storage and workspace. Finishes will be completed to match the existing finishes located in the space. New lights will be required in this area. Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression); 3) Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |