Similar Projects
Rehabilitation of Runway 7/25 Blairstown Airport
Infrastructure
Bidding
$3,000,000 CJ est. value
Blairstown, NJ 07825

Rehabilitation of Runway 7/25 Blairstown Airport
Infrastructure
Bidding
$3,000,000 CJ est. value
Blairstown, NJ 07825

Ridge Road Improvement Project
Infrastructure
Post-Bid
Hackettstown, NJ 07840

Settlers Ridge Roadway Improvement Project
Infrastructure
Post-Bid
Belvidere, NJ

Roadway Resurfacing Milepost 0 to 122
Results

Oxford WWTF Access Road
Results
NJ

Popeye's / Mansfield
New Construction, Infrastructure - 2,454 SF
Pending Verification
$800,000 CJ est. value
Mansfield Township, NJ 07865

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Supplying and Installing of Flexipave Porous Paving (Or Approved Equivalent) In Existing Tree Wells on Main Street
Results
Hackettstown, NJ 07840

Fabrication and/or Installation of Structural Steel & High and Low Pressure Pipe Work
Infrastructure
Post-Bid
$190,000 CJ est. value
Camden, NJ 08104

Rockfall Mitigation
Results
$5,000,001 to $10,000,000 est. value
NJ

Atlantic City Expressway Heavy Highway Job Order Contract
Term Contract
Post-Bid

Maintenance Job Order Contracting (Joc) Infrastructure Repairs, North - 2021
Results
$5,000,001 to $10,000,000 est. value

Asbestos Removal Warren County Court House
Term Contract, Infrastructure
Post-Bid
$138,600 CJ est. value
Belvidere, NJ 07823

Maintenance Job Order Contracting (Joc) Infrastructure Repairs, Central - 2021
Results
$5,000,001 to $10,000,000 est. value

Last Updated 09/13/2022 06:04 PM
Project Title

Warren Warehousing

Physical Address View project details and contacts
City, State (County) Belvidere, NJ 07823   (Warren County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $280,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Preliminary plans call for the phased construction of warehouses and manufacturing plants. The project will be constructed in four phases with the first phase consisting of 500,000 square feet to 1 million square feet of buildings on 50 to 75 acres of land. The other phases could take years or decades to develop and could total about 6 million square feet. As of August 19, 2022, this project is scheduled to go before the White Township on September 13, 2022. An architect has been selected; however, a general contractor or selection method is not disclosed. A firm construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 2,600,000 SF - 800,000 SF. 1,800,000 SF, 580.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents