Similar Projects
Silver Spruce Academy
New Construction, Infrastructure - 4,636 SF
Design
$1,200,000 CJ est. value
Durango, CO 81303

Mercury Rising
New Construction, Infrastructure
Design
$27,200,000 CJ est. value
Durango, CO 81301

RFP Developer - 211 West College Drive Conceptual Public-Private Partnership (PPP)
Infrastructure
Bidding
$20,000,000 CJ est. value
Durango, CO 81301

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

World-Wide Water Storage Tank Remediation
Term Contract
Results

D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

8th Avenue And College Avenue Road Diet Construction - City Of Durango
Infrastructure
Pending Verification
$2,100,000 CJ est. value
Durango, CO 81301

8th Avenue And College Avenue Road Diet Construction - City Of Durango
Infrastructure
Pending Verification
$2,100,000 CJ est. value
Durango, CO 81301

Cosmopolitan
New Construction, Infrastructure - 14,086 SF
Design
$5,500,000 CJ est. value
Durango, CO 81301

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Access Control Point Program Design Build II -- RFI(2)
Results

Durango High School - 2020 Bond - Durango School District 9-R
Infrastructure, Renovation
Pending Verification
$11,633,265 CJ est. value
Durango, CO 81301

General Maintenance Contractor Service
Infrastructure
Post-Bid
Ignacio, CO

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

Last Updated 10/25/2022 05:31 AM
Project Title

Watercraft ANS Decontamination Facility at Vallecito Reservoir

Physical Address View project details and contacts
City, State (County) Bayfield, CO 81122   (La Plata County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Buildings, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $731,337 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Oct 20, 2022 Contract Award Number: 140R4023C0001 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: EB1CPZZCJLF9 Contractor Awarded Name: KISSNER, G C INC Contractor Awarded Address: Austin, CO 81410-8357 USA Base and All Options Value (Total Contract Value): $731337.91140R4022R0023 - Watercraft ANS Decontamination Facility at Vallecito Reservoir This Solicitation is a Total Small Business Set-Aside. Solicitation Closing Date: September 26, 2022 Solicitation Closing Time: 14:00 (2:00 PM) Mountain Daylight Time The estimated magnitude of this project is between $500,000 and $1,000,000. Period of Performance: 10/17/2022 to 05/01/2024 Emailed proposals must be delivered to: BUREAU OF RECLAMATION Contracting Officer, Dwane Esplin, desplin@usbr.gov Proposals must be received in the Contracting Officer's email inbox no later than 14:00 hours (2:00 PM) MDT on or before September 26, 2022 to be considered for award. Emailed proposals must be clearly labeled with the following naming scheme: *Proposal - Company Name 140R4022R0023 - Watercraft ANS Decontamination Facility at Vallecito Reservoir* Only electronic proposals will be accepted. Inquiries regarding this Solicitation should be made to: Dwane D. Esplin, Contracting Officer E-mail: desplin@usbr.gov All correspondence regarding this Solicitation should reference Watercraft ANS Decontamination Facility at Vallecito Reservoir, Solicitation No. 140R4022R0023 in the subject line. Site Visit: For Site Visit information, please see section L, FAR CLAUSE 52.236-27 A1. Deadline for Questions: Offerors must submit all technical questions to Dwane D. Esplin at desplin@usbr.gov no later than September 15, 2022 - 14:00 PM (MDT) ONLY WRITTEN QUESTIONS WILL RECEIVE A RESPONSE. Each question submitted must reference the solicitation number (140R4022R0023) and the specific section, clause, paragraph, or drawing. Reclamation will post an amendment to SAM.gov to all questions with answers which may affect proposals. A PREBID SITE VISIT WILL BE HELD ON SEPTEMBER 8, 2022, BEGINNING AT 1:00 PM(MDT). ATTENDEES TO MEET AT THE VALLECITO RESERVOIR BOAT RAMP PARKING LOT LOCATED 16 MILES NORTH OF BAYFIELD, COLORADO.PLEASE REGISTER FOR THE SITE VISIT BY NOTIFYING THE CONTRACTING OFFICER (DWANE D. ESPLIN) VIA EMAIL AT DESPLIN@USBR.GOV. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents