Similar Projects
Airport Lots Development
Addition, Build-out, Infrastructure - 80,000 SF
Conception
$17,000,000 CJ est. value
Martinsburg, WV 25401

Health Department Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Martinsburg, WV 25403

Trade Center 81 - Chancellorsville Drive / Falling Waters
New Construction, Infrastructure - 915,420 SF
Design
$80,000,000 CJ est. value
Falling Waters, WV 25419

Pavement Markings Roadway Striping District Wide
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Hedgesville, WV 25427

Pavement Markings Roadway Striping District Wide
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Hedgesville, WV 25427

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

South Alabama Avenue, South Georgia Avenue, West John Street and Stephen Street Improvements
Infrastructure
Results
$1,305,000 est. value
Martinsburg, WV 25401

Giles Mill Road Water Main Extension
Infrastructure
Results
Bunker Hill, WV 25413

Martinsburg Land Warehouse
New Construction, Infrastructure
Pending Verification
$108,000,000 CJ est. value
Inwood, WV 25428

Martinsburg Land Warehouse
New Construction, Infrastructure
Pending Verification
$108,000,000 CJ est. value
Inwood, WV 25428

Middleway Bridge
Demolition, New Construction, Infrastructure
Design
$6,119,000 CJ est. value
Bunker Hill, WV 25413

Hedgesville High School Paving
Infrastructure
Post-Bid
Hedgesville, WV 25427

I-81 Exit 23 SB Exit Improv
Infrastructure
Results
WV

Winmar Estates Section 1 - Phase 1
New Construction, Infrastructure
Pending Verification
$6,500,000 CJ est. value
Martinsburg, WV 25401

Last Updated 01/10/2023 05:05 PM
Project Title

Construction of Entry Road (Corning Way) Extension

Physical Address View project details and contacts
City, State (County) Martinsburg, WV 25401   (Berkeley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Development Authority of Berkeley County, West Virginia (herein referred to as the Development Authority or BCDA ) is requesting Proposals from interested parties for the Construction of Entry Road (Corning Way) Extension Berkeley County, WV . The Development Authority (or its designated representatives) will be evaluating submissions to this request (the Proposals ) and will ultimately select an individual and/or firm judged to be both responsible and responsive to the request in every way. The Development Authority may interview some or all prospective individuals/firms to discuss Proposals. Inquiries should be directed to Jennifer Smith, Executive Director, 304-267-4144. The Development Authority shall make positive efforts to utilize Disadvantaged Business Enterprises for its supplies and services and shall allow these sources the maximum feasible opportunity to compete for contracts. The Development Authority does not discriminate on the basis of race, color, national origin, sex, religion, age or disability for the provision of services. The successful bidder shall provide and deliver labor and materials necessary to complete the construction of the Entry Road (Corning Way) Extension, including but not limited to: 1. Continuance allowance for site access, including to the Clorox plant 2. 2 Asphalt Surface Course (Surface SM 12.5A) 3. Bituminous Tack Coat 4. 4 Asphalt Base Course (Base BM 25.0) 5. Compacted Subgrade 6. 12 Dirty Tailing or Rock Dirt Combination 7. 200 LB Woven Fabric (WVDOH Approved) 8. Shoulder (Build-up to match top of asphalt) 9. Ditch flowline (Grade to Drain) The Development Authority reserves the right to accept or reject any or all proposals, to waive technicalities, and to take whatever action is in its best interest.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents