Similar Projects
Billy Woods Canal (Butler Farm Road Wet Ponds) - City of Hampton
Infrastructure
Conception
$5,800,000 est. value
Hampton, VA 23666

5th Street Parking Lot Bioretention Project
Infrastructure
Bidding
$107,798 est. value
Warrenton, VA 20186

Waterford Mill Restoration
Infrastructure
Bidding
$75,000 est. value
Leesburg, VA 20175

Dumfries Road Shared Use Path
Alteration
Post-Bid
Manassas, VA 20110

Copy Of Hdpe Lining For Matal Pipe
Infrastructure
Post-Bid
Culpeper, VA 22701

Bayberry Subdivision Drainage Improvements - Phase 1
Results
Newport News, VA

High Density Polyethylene (HDPE) Pipe Culvert
Results
Fancy Gap, VA 24328

Shaw Road Widening and Drainage Improvements
Infrastructure
Bidding
$2,938,879 est. value
Sterling, VA 20163

Scale Pit Wall and Headwall Repairs
Infrastructure
Post-Bid
Petersburg, VA

Polymer Coated Corrugated Metal Pipe - Willis and Check Areas
Results
Check, Willis, VA 24380

James River Treatment Plant Shoreline Stabilization
Infrastructure
Bidding
$1,580,000 est. value
Newport News, VA 23602

Ringgold Rail Trail Restoration
Infrastructure
Post-Bid
Chatham, Sutherlin, VA 24594

Otterdale Road Drainage Improvements Project
Infrastructure
Results
$14,000,000 to $17,000,000 est. value
VA

Box Culvert - Route 619
Infrastructure
Post-Bid
Luray, VA

Brick Church Road BMP Level II Wet Pond
Infrastructure
Results
Newport News, VA

Reported 07/11/2022 04:39 PM
Project Title

Salt Pond Dredging - City Of Hampton

Physical Address View project details and contacts
City, State (County) Hampton, VA   (Hampton City County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Hampton, Virginia. Conceptual plans call for site work for a water / sewer project. Salt Ponds Inlet is currently being dredged every 18 months to 2 years due to sand migration into the inlet. Dredged sandy material is placed on the Salt Ponds beach. The last dredging was completed in August of 2017. Dredging should continue until the inlet improvements are complete. As of July 08, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents