Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Grier Student Center Chiller Replacement
Results
$367,429 est. value
Greenwood, SC

HVAC Renovation for Bldg 174 Aerial Delivery Facility
Results
$250,000 to $500,000 est. value
Charleston, SC 29404

Replace HVAC Systems and Water Heaters at Florence School District 5, Johnsonville Middle School
Post-Bid
$500,000 to $1,000,000 est. value
Johnsonville, SC

Senior Center HVAC System
Results
Central, SC

Sumter Street HVAC Replacement
Post-Bid
$500,000 to $550,000 est. value
Columbia, SC

Geology Building - Repair - Replace Roof Top HVAC Unit
Results
$139,000 est. value
Columbia, SC

HVAC Maintenance Service and Repairs for 2019
Term Contract
Post-Bid
Pineridge, SC

Back-up HVAC System for Server Room
Results
Charleston, SC 29415

Storm Eye Institute Chiller Replacement - Phase II
Post-Bid
$2,000,000 to $3,000,000 est. value
Charleston, SC

Robertson Hall Chiller
Results
$79,810 est. value
Spartanburg, SC

MUSC HCC 4th Floor Mechanical Room Cooling
Post-Bid
Less than $100,000 est. value
Charleston, SC

Boiler Repair
Results
Charleston, SC 29404

HVAC Installations at Chester Middle School Gym and Great Falls Elementary School Gym
Post-Bid
Chester, SC

Last Updated 02/04/2019 01:13 PM
Project Title

HVAC Replacement for Aquatic Center

Physical Address View project details and contacts
City, State (County) SC   (Orangeburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Furnish and install where indicated, factory-assembled, enclosed swimming pool environmental control/energy recovery system. System shall include mechanical heat recovery; electronically commutated (EC) direct drive plenum supply, exhaust and purge fans; supply air, outside air, exhaust air and purge air flow monitor stations; all air dampers; pool water condenser; hot gas reheat section; moisture disposal; complete solid state logic control system; factory-installed and wired in a single unit enclosure with remote condenser (ACC). Unit will be set on steel supports with horizontal discharge arrangements.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents