Last Updated 06/09/2020 09:40 AM
Project Title

960 Zone North South Transmission Main, North Tryon Pressure Zone Boundary Change, Idlewild Booster Pump Station Supply Main, and Airport Area Transmission Main Projects

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Analysis, design and construction for the 960 Zone North South Transmission Main, North Tryon Pressure Zone Boundary Change, Idlewild Booster Pump Station Supply Main, and Airport Area Transmission Main Projects (Project). Proposers need to assemble a team of experts including at a minimum design, survey, geotechnical, environmental, permitting, real estate acquisition including appraisal and legal, and construction contractors.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents