Similar Projects
Multipurpose Building
New Construction - 2,400 SF
Design
$100,000 to $250,000 est. value
Smithville, MO

Y--Mingo Maintenance Building
Renovation - 6,000 SF
Design
$1,000,000 to $5,000,000 est. value
Puxico, MO 63960

Qualifications for Construction Manager at Risk Services
New Construction
Post-Bid
North Kansas City, MO

Missouri Farm Bureau Restroom
Renovation, Addition
Post-Bid
Jefferson City, MO 65109

Conference Room Remodel for former Council Chambers
Results
Republic, MO

Camdenton Community Center
New Construction - 22,000 SF
Results
Camdenton, MO 65020

Phase I - Center Redevelopment Welcome and Wellness Centers
New Construction, Demolition - 144,100 SF
Design
$1,000,000 to $5,000,000 est. value
Saint Louis, MO

Construction Manager for the New Municipal Facilities
New Construction
Post-Bid
Jennings, MO

Rec Plex North Renovations
Renovation
Results
Saint Peters, MO 63376

On-Call General Contractor Service
Renovation, Term Contract
Post-Bid
MO

Middlebush Farm-Nextgen Center Of Excellence For Influenza Research
New Construction
Results
$3,157,000 to $3,508,000 est. value
Columbia, MO 65201

Bathroom Remodeling
Renovation - 264 SF
Post-Bid
Cuba, MO 65453

Lower Level Renovation
Renovation
Results
Kingston, MO 64650

Relocation of Train Depot
Renovation
Post-Bid
Bethany, MO 64424

FMS Building
Addition
Results
Saint Joseph, MO

Reported 06/15/2022 12:00 AM
Project Title

Corrosion Control Repairs at Transportation Districts 3 and 4

Physical Address View project details and contacts
City, State (County) Affton, Wildwood, MO 63021   (Saint Louis County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $144,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes repairs to buildings and utility structures at the St. Louis county transportation districts 3 and 4. The work includes replacement of corroded building column sections, repair and strengthening to steel hopper rack framing, installation of metal stair, painting and power washing.

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents