Similar Projects
Address Pavement Condition of I-065 Both Direction(S) From Milepoint 13.711 to Milepoint 25
Infrastructure
Conception
$13,500,000 CJ est. value
Bowling Green, KY 42103

Address Pavement Condition of I-065 Both Direction(S) From Milepoint 13.711 to Milepoint 25
Infrastructure
Conception
$13,500,000 CJ est. value
Bowling Green, KY 42103

Irrigation Improvement Project
Infrastructure
Bidding
$1,825,956 CJ est. value
Bowling Green, KY 42103

FY2022 Sidewalk Repairs
Infrastructure
Bidding
$400,000 CJ est. value
Bowling Green, KY 42101

Greenwood High School Bid Group 1 -Turf Fields and New Road Construction
Infrastructure
Sub-Bidding
$2,800,000 CJ est. value
Bowling Green, KY 42104

Greenwood High School Bid Group 1 -Turf Fields and New Road Construction
Infrastructure
Sub-Bidding
$2,800,000 CJ est. value
Bowling Green, KY 42104

Production Avenue Extension and Fred Madison Realignment
Post-Bid
Bowling Green, KY

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Bowling Green Downtown Improvements Phase II
Results
Bowling Green, KY

North Sunrise Drive and Kenton Street Drainage Improvements
Alteration
Results
Bowling Green, KY 42101

Brookwood Drive Residential Subdivision
New Construction, Infrastructure
Pending Verification
$106,000,000 CJ est. value
Bowling Green, KY 42101

Russellville Road Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Bowling Green, KY 42101

FY22-23 Sewer Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Bowling Green, KY 42101

Warren County Road
Infrastructure
Post-Bid
Bowling Green, KY 42101

FY22 Street Overlay
Infrastructure
Results
$1,500,000 est. value
Bowling Green, KY

Last Updated 10/17/2022 04:02 PM
Project Title

Warren County Stormwater Quality Improvements - FILOC Project - Phil Moore Park

Physical Address View project details and contacts
City, State (County) Alvaton, KY 42122   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Warren County Stormwater Quality Improvements - FILOC Project - Phil Moore Park The project provides for all labor, materials, and equipment necessary to provide boulder bank/toe stabilization along approximately 235 feet of the left descending bank of Drakes Creek, seeding of native herbaceous species, planting of native trees and shrubs, enhancements to an existing kayak/ canoe launch, establishment of a new 11-foot wide kayak/canoe launch, and improvements to and stabilization of the existing gravel access turnaround loop Bids will be opened immediately thereafter in the lobby area outside the Judge Executive's Office. Bids must be received by the designated date and time, and none will be considered thereafter. Bid documents may be examined at the following locations: RES Kentucky, LLC Office of Warren County, 2nd Floor 2307 Greene Way, Suite B Warren County Courthouse Louisville, KY 40220 429 East 10th Street, Suite 201 (502) 625-3009 Bowling Green, KY 40201 (502) 895-4444 A bid bond, certified check or cashier's check, made payable to the Warren County Fiscal Court, in an amount equal to 5% of the bid shall be submitted with each bid. No bid will be considered unless it is guaranteed in this manner. Warren County Fiscal Court reserves the right to reject any and all bids and to accept the best evaluated bid. The successful bidder shall be an Equal Opportunity Employer. Questions regarding the bid documents must be submitted to Nikki Koller(nikki.koller@ky.gov) no later than seven (7) days before the bid opening date Your bid shall be submitted in an 8 1/2 " x 11" envelope as "Warren County Stormwater Quality Improvements - FILOC Project - Phil Moore Park" with the bidder's name and address included on the envelope.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents