Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

Concrete Shared-use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Bidding
$1,490,000 est. value
Pleasant Ridge, MI 48069

Rochester High School Storm Drainage Projects
Post-Bid
Rochester Hills, MI 48309

Mercer Beach Improvements Phase 1
Infrastructure
Post-Bid
Walled Lake, MI

Lee Begole Drive Headwall Reconstruction / Bishop Creek Streambank Restoration
Results
Less than $940,384 est. value
Novi, MI 48375

11 Mile Road over Novi-Lyon Drain Culvert Replacement
Results
Beverly Hills, MI

Lahser Road Drainage Repairs
Infrastructure
Post-Bid
Beverly Hills, MI 48025

Corrugated Metal Pipe, Bands, And Bolts
Results
Beverly Hills, MI

Corrugated Metal Pipe, Bands, and Bolts
Infrastructure
Post-Bid
Beverly Hills, MI

Union Lake Road Over Hayes Drain
Results
Less than $970,000 est. value
Beverly Hills, MI

Drainage System Cleaning - Oakland TSC(Transportation Service Center)
Infrastructure
Post-Bid
Pontiac, MI 48341

Beach Erosion Control at Camp Dearborn
Results
Milford, MI 48380

Milford Road over Buckhorn Creek
Results
Beverly Hills, MI

Drainage Structure Repairs and Concrete Curb And Gutter
Results
MI

Trench Drain and Asphalt Repair
Results
Bloomfield Hills, MI

Reported 05/11/2022 12:00 AM
Project Title

12 Mile Road Culvert Replacement

Physical Address View project details and contacts
City, State (County) Pontiac, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Road Commission for Oakland County is requesting proposals for a 12 Mile Culvert Replacement project to include all labor, materials and equipment needed to complete the project as specified. Lump-sum project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents