Similar Projects
Civic Campus HVAC System Upgrade Project
Alteration
Bidding
$75,000 to $80,000 est. value
Pacific, WA 98047

Navy Replace Chillers 1 and 2 - Naval Base Kitsap
Alteration
Bidding
$500,000 est. value
Bremerton, WA 98312

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

Lions Pool Air Handling and Dehumidification System Improvements
Alteration
Bidding
$493,000 est. value
Yakima, WA 98902

HVAC and Air Filtration Systems
Renovation, Alteration
Post-Bid
Sunnyside, WA

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

Residential Weatherization Insulation 8572
Alteration
Bidding
$300,000 est. value
Tacoma, WA

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

HVAC Installation
Alteration
Bidding
$300,000 est. value
WA

Longfellow Elementary HVAC Replacement
Alteration
Post-Bid
Pasco, WA

3rd Floor Judges Chambers HVAC Project
Alteration
Results
$90,000 to $110,000 est. value
Bellingham, WA 98225

Last Updated 06/29/2022 11:47 PM
Project Title

Building 73 and 1058 Install High Efficiency Particulate Air Filter System

Physical Address View project details and contacts
City, State (County) Keyport, WA 98345   (Kitsap County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

NAVSEA NUWC Division -Keyport has a requirement for two High EfficiencyParticulate Air (HEPA) filtration systems to be fabricated and installed on to the exhaust of two (2) dust collectors one each located at bldg. 73 and bldg. 1058 . The project will require the contractor to fabricate and install ducting for each of the two HEPA filtration systems. The filtration systems shall fit on the existing concrete pads with the dust collection units. The Contractor shall provide all the labor, materials, and equipment, as required, to perform the work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents