Similar Projects
HMA Crack Filling
Infrastructure
Bidding
$1,250,000 CJ est. value
Elkport, IA 52048

HMA Crack Filling
Infrastructure
Bidding
$1,250,000 CJ est. value
Elkport, IA 52048

Adams Court Improvements
Infrastructure
Results
$147,668 est. value
Garnavillo, IA

Big Spring Fish Hatchery Road Reconstruction
Infrastructure
Results
$110,000 est. value
IA

HMA Crack Filling
Infrastructure
Bidding
$500,000 CJ est. value
Elkport, IA 52048

PCC Pavement - Replace
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

Industrial Street Improvements
Infrastructure
Results
$294,015 est. value
Garnavillo, IA 52049

Pikes Peak Campground Upgrade Project
Infrastructure
Results
$2,200,000 est. value
McGregor, IA 52157

HMA Paved Shoulder - New - U.S. 52
Infrastructure
Results
IA

Granular Surfacing of Roadway
Infrastructure
Results

Viking Trail Improvements Project
Infrastructure
Results
$200,000 est. value
Edgewood, IA

HMA Resurfacing
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
Elkader, IA 52043

Last Updated 09/20/2022 11:34 PM
Project Title

RCB Culverts New-Single Box, HMA Resurfacing on Thunder Road Project

Physical Address View project details and contacts
City, State (County) Guttenberg, IA 52052   (Clayton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,844,360 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

RCB culverts New-Single Box, HMA Resurfacing on Thunder Road from US 52 east 2.96 miles to Clear Creek Road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents