Similar Projects
South Hartford Conveyance and Storage Tunnel - Tunnel Pump Station Contract No. 3
New Construction
Bidding
Hartford, CT

Provision and Installation of a Prefabricated Pump Station
Post-Bid
Groton, CT 06340

Construction of Stormwater Pumping Station, Stratford, CT
Post-Bid
$5,000,000 to $10,000,000 est. value
Stratford, CT

Wastewater Pump Stations Rehabilitation Project
Renovation
Results
Stafford, CT 06615

Easton Turnpike Pump Station and Force Main Replacement
Results
Fairfield, CT 06824

Evergreen Avenue Sewer Pump Station Supply and Installation of Fourth Pump
Infrastructure
Post-Bid
Waterford, CT 06385

Steele Street Pump Station Modifications
Renovation
Results
Less than $443,700 est. value
New Britain, CT

Construction Of The Old Lyme Shared Sewer Infrastructure At Pump Station
New Construction
Post-Bid
Manchester, CT

Route 133 Pump Station Improvements
Results
Brookfield, CT

Old Lyme Associations Pump Station
New Construction
Post-Bid
Old Lyme, CT

Construction of Raymark Stormwater Pumping Station, Stratford, Ct
Results
Stratford, CT

Gulf Street Sanitary Pump Station Repairs
Results
Milford, CT 06460

Wet Well Ventilation Upgrades for Gravel Street Pump Station
Results
Mystic, CT 06355

Goss Cove Pump Station Improvements
Results
Groton, CT 06340

Water Pollution Control Authority Phase I Pump Station Upgrades
Results
$3,200,000 est. value
Hebron, CT 06248

Last Updated 10/14/2021 08:12 AM
Project Title

Woodruff Hill Sanitary Sewage Pump Station at E. Commerce Drive

Physical Address View project details and contacts
City, State (County) Oxford, CT   (New Haven County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the furnishing and installation of two 110 GPM submersible pumps, precast concrete wet well and valve chamber, an 80 KW propane emergency power generator set, security fencing, site restoration and various appurtenances.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents