Similar Projects
Bennett Intermediate School Folding Partition
Post-Bid
Boiceville, NY

2018 Community Schools Grant Work
Post-Bid
Albany, NY 12206

Asbestos Abatement Monitoring IDIQ
Results
Watervliet, NY

Construct Mezzanine in Small Air Terminal
Results
Balmville, NY 12550

Upgrade Mechanical, Electrical and Plumbing Systems at Champlin Hall - Suny Cobleskill
Post-Bid
$5,000,000 to $10,000,000 est. value
Cobleskill, NY

Glassreplacement Tate Hockey Rink
Results
West Point, NY 10996

Replace Folding Partitions Hunt Union/Chase
Post-Bid
Oneonta, NY 13820

Removal, Destruction and Disposal of Aqueous Film-Forming Foam (AFFF).
Results
Abbeville, AL

Household Hazardous Waste Collection
Term Contract
Post-Bid
Poughkeepsie, NY

Relocate Wall Display -West Point
Results
West Point, NY 10996

Corliss Avenue Properties Asbestos Abatement and Demolition
Demolition
Post-Bid
Less than $1,500,000 est. value
Binghamton, NY

S--Reusable Sharps Container Removal and Disposal-528 and 528A8
Results
Albany, Bainbridge, Batavia, Buffalo, Catskill, Clifton Park, Fonda, Jamestown, Niagara Falls, Olean, Springville, Westport, NY 14215

Asbestos Abatement
Post-Bid
Brockport, NY

Bronxville U.F.S.D Ceiling Replacement North and South Playrooms at Bronxville School
Results
Bronxville, NY

Chase PE Ceiling Replacement
Term Contract
Post-Bid
Oneonta, NY

Last Updated 12/10/2018 09:37 AM
Project Title

Alfred State College, Braddon and Peet Halls Curtain Wall Replacement with Asbestos and Hazardous Materials Abatement

Physical Address View project details and contacts
City, State (County) Alfred, NY 14802   (Allegany County)
Category(s) Environmental, Single Trades
Sub-Category(s) Finishes/Interior, Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 to $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The scope of the project consists of removing the original 1962 vintage aluminum curtain wall and window assembly and replacing it in kind. The work area will consist of the 3rd and 4th floor lounge spaces, along with the second floor resident director's apartments. The curtain wall at the ends of the hall and in the stairwells at the east and west sides of the buildings will be removed and replaced as an alternate. The energy performance of the curtain wall and window assemblies is based on the IECC 2015 as modified by the 2016 New York State Supplement. The project will also have a limited amount of masonry restoration of the brick around the curtain wall areas being replaced.
Details
Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents