Similar Projects
Newport Avenue Mixed-Use Development
New Construction, Infrastructure - 14,800 SF
Conception
$128,000,000 CJ est. value
Attleboro, MA 02703

Locust Street Solar
New Construction, Infrastructure
Conception
$500,000 est. value
Freetown, MA

Walker Street/Mixed Use - 175 South Walker Street, LLC
New Construction, Infrastructure - 5,400 SF
Design
$3,000,000 CJ est. value
Taunton, MA 02780

Norton Senior Center
New Construction, Infrastructure - 11,850 SF
Design
$5,884,905 CJ est. value
Norton, MA 02766

Fall River Quequechan River Rail Trail Westport Extension
Infrastructure
Bidding
$600,000 CJ est. value
Fall River, MA 02721

Water Distribution and Sewage Collection System Improvements
Infrastructure
Bidding
$350,000 CJ est. value
Somerset, MA 02726

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Site Improvements Chor Bishop
Infrastructure
Post-Bid
Fall River, MA

Installation of Approximately 8,700 Linear Feet of Eight-Inch Diameter Cement Lined Ductile Iron Water Main
Results
$2,000,000 est. value
North Attleborough, MA

Water Improvement Project - May Street and Lake Como Area
Results
North Attleborough, MA

45 Braley Road Solar
New Construction
Pending Verification
Freetown, MA 02717

Taco Bell / Attleboro
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Attleboro, MA 02703

Buttonwood Park Zoo - City of New Bedford
New Construction, Renovation, Infrastructure
Conception
$3,200,000 CJ est. value
New Bedford, MA 02740

Automatic Meter Reading (AMR) System/ Advanced Metering Infrastructure (AMI) System
Infrastructure
Bidding
$500,000 CJ est. value
Taunton, MA 02780

Water Meter Replacement
Infrastructure
Post-Bid
North Dighton, MA

Last Updated 09/14/2022 12:05 PM
Project Title

Main Street Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) North Dighton, MA 02764   (Bristol County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $2,905,225 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 14, 2022, the project has been awarded, however, information regarding the awarded general contractor has not been confirmed at this time. Main Street Water Main Replacement Project, which includes installation of approximately 12,500 linear feet of 12-inch to 6-inch water main, appurtenances, and related gate valves, hydrants, fittings, service connections; and all materials and equipment, services and construction inherent to the Work. The Work shall be substantially complete within 230 calendar days from the commencement of Contract Time and completed and ready for final payment within 450 calendar days from the commencement of Contract Time. The Project is funded in part with monies made available by the Drinking Water State Revolving Fund (SRF) and is to be funded in part by the Massachusetts Clean Water Trust and compliance with EPA, MassDEP/DMS provisions and policies and Davis-Bacon Act and wage requirements is required. Disadvantaged Business Enterprise goals are applicable to the total dollars paid under the resulting construction Contract. The goals for this Project are a minimum of 4.20 percent D/MBE participation and 4.50 percent D/WBE participation by certified DBEs.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents