Similar Projects
The Dairy At Hillcrest
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Hogansville, GA 30230

I-185 From S of SR 1 to I-85
Infrastructure
Design
$4,000,000 CJ est. value
Lagrange, GA 30241

RFP - Additions, Renovations, & Modifications
Addition, Demolition, Infrastructure, Renovation
Bidding
$17,000,000 CJ est. value
Lagrange, GA 30240

RFP - Additions, Renovations, & Modifications
Addition, Demolition, Infrastructure, Renovation
Bidding
$17,000,000 CJ est. value
Lagrange, GA 30240

Authentix Residential Development / LaGrange, GA
New Construction, Infrastructure
Sub-Bidding
$30,000,000 CJ est. value
Lagrange, GA 30241

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Hills and Dales Force Main Improvements
Infrastructure
Results
Lagrange, GA

Widening and Reconstruction on US 27/SR 1(Hamilton Road)
Infrastructure
Results
$24,496,534 CJ est. value
Bremen, GA 30110

Crossvine Village - Multi-Family and Commercial
New Construction, Infrastructure - 60,000 SF
Construction
$250,000,000 CJ est. value
Lagrange, GA 30241

Crossvine Village - Multi-Family and Commercial
New Construction, Infrastructure - 60,000 SF
Construction
$250,000,000 CJ est. value
Lagrange, GA 30241

Daesol Ausys Manufacturing at Northwest Harris Business Park
New Construction, Infrastructure
Pending Verification
$72,000,000 CJ est. value
West Point, GA 31833

Colonial Hotel Streetscape Enhancements
Infrastructure
Post-Bid
$500,000 est. value
Lagrange, GA 30240

Water System Improvements, Bass Cross Road Water Line
Infrastructure
Results
$800,000 est. value
Hogansville, GA 30230

Rosemont Elementary School
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Lagrange, GA 30241

Last Updated 10/09/2023 09:11 AM
Project Title

Lincoln Street - Dallis Street Intersection Improvement and Landscape Improvement

Physical Address View project details and contacts
City, State (County) Lagrange, GA 30240   (Troup County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $570,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is made up of two different components: Roadway intersection and corridor improvements and Landscape/Hardscape Improvements along Dallis in front of the businesses. The roadway portion of the project consists of roadway construction to make improvements to the Lincoln - Dallis Street Intersection to improve the safety of pedestrians and vehicular traffic at the intersection. The project will include changing the roadway corridor to provide additional parking along the west side of the south bound lane. The roadway portion of the project will include milling and repaving, curb & gutter, storm drainage, striping, and signage. The project will also include Landscaping Improvements which include hardscaping for useable sitting space, sidewalks, fountain, seat walls, trash receptables, benches, lighting and irrigation. The work will be awarded in 1 Contract. The Instructions to Bidders, Bid, Contract Agreement, Drawings, Specifications and forms of Bid Bond, Performance Bond, Payment Bond and other Contract Documents Each Bid must be accompanied by a Bid Bond, prepared on the form of Bid Bond attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed as a certified company in the latest issue of U.S. Treasury Circular 570, in the amount of five percent of the Bid. The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of 100 percent of the Bid. The Owner reserves the right to reject all Bids, to waive informalities and to readvertise.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents