Similar Projects
Last Updated | 10/20/2022 09:31 AM |
Project Title | RFQ Contractor - University of Alabama at Birmingham (UAB) NP 6 Tee Room Renovation |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35233 (Jefferson County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected November 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $375,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ***As of October 20, 2022. Bid is cancelled. Minor interior demolition of the existing project area, renovation/ reconfiguration of the area to modify two (2) TEE Treatment rooms, including but not limited to partitions, ceilings, finishes, concrete patching, plumbing, fire sprinkler, HVAC, and electrical work. The work will be performed using Infection Control measures so that adjacent operations can continue without interruption. The project is located contiguous with fully functioning patient clinical areas and Contactors must have significant experience as a General Contractor in working in a hospital clinical environment and have knowledge and experience with implementation, monitoring, and maintaining Infection Control and Interim Life Safety Measures. This project will require significant coordination, working with the Owners representatives to successfully deliver the project. The construction budget is anticipated to be between $275,00-$375,000. The original and two (2) flash drives with duplicates of submittals are required for pre-qualification approval; however, email transmission copies may be transmitted to the Project Manager at jeorr@uabmc.edu and copied to hollys@bpa.net to expedite the review process with a hard-copy of the submittal and two flash drives to be delivered within 24 hours. Prime contractor bidders interested in submitting a proposal must apply for pre-qualification and must be licensed under the Provision of Title 34, Chapter 8, and Code of Alabama, 1975. A copy of current Alabama Contractors license is to be included in pre-qualification submittal. Pre-qualification Requirements Information Package may be obtained from the Architect upon letterhead request. The Owner reserves the right to waive technical errors in applications, or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby. Additional sets for pre-qualified prime contractor bidders, subcontractors, vendors, or dealers may be obtained upon payment of the same deposit. The deposit for additional sets shall be refunded less the cost of printing, reproduction, handling and distribution, upon return of the documents in reusable condition within ten (10) days after bid opening. A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidders proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |