Similar Projects
FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Well and Booster Pump Maintenance Contract - Scheduled and Emergency Service
Alteration
Bidding
Farmingdale, NY

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Acceptance, Removal and Processing of Post Consumer Residential Electronic Waste
Term Contract
Post-Bid
Port Washington, NY 11050

Baldwin Bowling Center Drainage Improvements
Alteration
Results
Baldwin, NY 11510

Well Pump No. 1 Booster Pump, and Transfer Pump Replacement
Infrastructure
Results
Roslyn Heights, NY

Red Barn Dog
Renovation - 6,053 SF
Pending Verification
Bethpage, NY 11714

Playground Sand and Limestone Screening
Infrastructure
Post-Bid
NY

On-Call Engineering Services for Transportation Engineering
Infrastructure
Post-Bid
Syosset, NY

Northwell - 600 Community Drive
Addition, Alteration - 14,200 SF
Post-Bid
Great Neck, NY 11020

Well and Booster Pump Maintenance Contract
Term Contract, Infrastructure
Post-Bid
Plainview, NY 11803

Replacement of Well No 4B
Infrastructure
Post-Bid
Rockville Centre, NY

Rehabilitation of Well No 1A
Infrastructure
Post-Bid
Rockville Centre, NY

Treatment Improvements for the Removal of 1,4 Dioxane, East Meadow Wells 5 and 11 in the East Meadow Water District
Infrastructure
Post-Bid
Hempstead, NY

Eden Well Rehabilitation
Infrastructure
Post-Bid
Great Neck, NY

Last Updated 12/17/2021 11:03 AM
Project Title

Plumbing Construction - Hewlett Well 4

Physical Address View project details and contacts
City, State (County) Port Washington, NY 11050   (Nassau County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

(Rebid: we do not have the original project). construction of a new advanced oxidation process facility including a building enclosure and new piping, valves, chemical treatment, standby generator, a new booster pump and building enclosure, and all appurtenances and accessories as shown on the Drawings and specified herein. The work also includes all associated connections to the existing well, nitrate removal, and granular activated carbon facilities at the site, power, controls, SCADA, all wiring and devices, site paving and restoration, and other utility work as shown and called for in conformance with the Contract Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents