Similar Projects
Cypress Lake United Methodist Church Multipurpose Facility
New Construction, Addition - 18,262 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Myers, FL

Coca-Cola Florida Manufacturing and Distribution Center
New Construction - 1,400,000 SF
Conception
$300,000,000 est. value
Brandon, FL 33511

Safe & Secure Self Storage
New Construction - 220,100 SF
Design
$10,000,000 CJ est. value
Oakland Park, FL 33311

Studio Works
New Construction - 22,671 SF
Design
$1,950,000 est. value
Hobe Sound, FL 33455

Ocala Golf Club Open-Bay Steel Structure Construction Project
New Construction - 3,744 SF
Bidding
Ocala, FL 34470

Quick Turnaround Rental Car Facility Bid Package 3 (Tractor Trailer Lot and Boat and RV Storage)
New Construction, Infrastructure
Bidding
Sarasota, FL 34243

Lockhart Self-Storage
New Construction - 83,073 SF
Sub-Bidding
Panama City, FL 32461

Storage Authority
New Construction - 81,771 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Kissimmee, FL 34758

54--Shed
New Construction
Post-Bid
Dahlonega, Fort Benning, GA 30533

Purchase and Installation of Warehouse Storage and Management Systems
Results
Key West, FL 33040

Manufacture and Delivery of Two Chemical Storage Buildings
Results
FL

Jensen Beach Auto Vault
New Construction - 231,075 SF
Construction
$2,999,998 est. value
Jensen Beach, FL 34957

Boston Whaler Expansion
New Construction - 326,000 SF
Construction
$42,000,000 est. value
Edgewater, FL 32141

Twin Lakes
New Construction
Pending Verification
Davie, FL 33314

Swift Self Storage
New Construction - 108,900 SF
Pending Verification
Bradenton, FL 34212

Last Updated 04/19/2022 10:33 AM
Project Title

Self Storage Facility

Physical Address View project details and contacts
City, State (County) Bradenton, FL   (Manatee County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 3 Stories Above Grade, 120,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents