Similar Projects
SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

2018 Kracker Avenue Restoration Project
Results
Less than $1,458,007 est. value
Gibsonton, FL 33534

Grading - Gibsonton Tract Mitigation Site
Infrastructure
Results
$3,159,800 est. value
FL

Trench Drain System
Infrastructure
Post-Bid
Tampa, FL

Drainage In Field Corridors, Tournament Sportsplex
Infrastructure
Results
Tampa, FL 33619

Plato Academy Drainage Project
Alteration
Post-Bid
Tampa, FL 33625

Grading - US 92 - Drainage Improvements
Infrastructure
Results
$3,693,800 est. value
Seffner, FL 33584

Sediment Control Structures-Baffle Boxes Inspection and Maintenance Service
Infrastructure
Post-Bid
Tampa, FL

Milling and Resurfacing/Shoulder Widening/Drainage Improvements-SR 39 (Paul s Buchman Hwy)
Infrastructure
Results
$13,282,900 est. value
FL

12 Gage - 60 Inch Corrugated Aluminized Steel Round Pipe and Band
Infrastructure
Post-Bid
$23,688 est. value
Tampa, FL

SR 574 - Drainage Improvements
Infrastructure
Results
$248,200 est. value
FL

Drainage Project of Lake Magdalene and Roosevelt Elementary Schools
Term Contract
Results
Tampa, FL 33612

Outfall Maintenance Services for Mobility Department
Infrastructure
Results
Tampa, FL

Edward Medard Dam Discharge and Spillway Rehabilitation
Renovation, Infrastructure
Results
Plant City, FL 33567

Last Updated 06/28/2022 11:18 PM
Project Title

Sports Field Drainage Project, Tournament Sportsplex

Physical Address View project details and contacts
City, State (County) Tampa, FL 33619   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Locate existing flat 12-inch drainage that is on 15-foot centers. 2. Layout trenches parallel to existing drainage on 20-foot centers. 3. Sod cut at a depth of 1 in. removed to the side of the trench to be reinstalled at the end of construction. 4. Trench shall be a minimum of 9 inches wide and 15 inches deep. 5. Rock bed shall be washed 89 granite stone of a minimum depth of 9 inches the bottom of which shall produce a constant grade of not less than 0.5 % slope. 6. Trench shall be filled with 3/4 inch layer of gravel on the bottom, then install 4 inches N12 ADS pipe in the center of the trench. Then, backfill with a minimum of 9 inches of gravel. 7. Install 90/10 root zone mix on top of the gravel, maximum depth of 6 inches, then compact with plate compactor, level, and reinstall sod. 8. The outfall of the 4-inch N12 pipe will be connected to the existing 6-inch N12 pipe running along the sideline of the field. Sports Field Drainage Project, Tournament Sportsplex. Project Work at the Hillsborough County Tournament Sportsplex. The Tampa Sports Authority Reserves the Right to Reject Any and All Bids, to Waive Irregularities, if Any, and Accept the Bid, Which in the Judgment of the Authority, Is Determined to Be in Its Best Interest.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents