Similar Projects
Stationhouse and East Parking Lot - Double Track Project 3
New Construction
Bidding
Gary, IN

Ignition Park EV Charging Park
Bidding
South Bend, IN 46624

Asphalt Repairs
Post-Bid
Angola, IN 46703

Vienna-Finley ES Parking Lot Improvements D/B RFP
Post-Bid
Scottsburg, IN 47170

ADA Improvements and Handicapped Push Button Entry System
Results
$122,408 est. value
Crown Point, IN 46307

Bike and Pedestrian Facilities
Results
IN

Bike and Pedestrian Facilities
Bidding
IN

Sidewalk Installation/Repair on Scattered Site ECHA Properties
Post-Bid
East Chicago, IN 46312

Curb and Gutter, Sidewalk, and ADA Ramps
Results
Indianapolis, IN 46204

Bike and Pedestrian Facilities
Bidding
Bloomington, IN

Recover Forward Sidewalk
Post-Bid
Bloomington, IN 47402

Downtown Streetscape Revitalization
Results
Bremen, IN 46506

ADA Sidewalk Ramp Construction
Bidding

South Parking Lot and Entrance Lane Sealcoating
Post-Bid
Indianapolis, IN 46200

2020 CCMG Paving & Second Street Resurfacing & Sidewalks
Results
$421,951 est. value
Orleans, IN 47452

Reported 04/01/2021 12:00 AM
Project Title

Cascades Trail Phase 5 and Streambank Stabilization in Lower Cascades Park

Physical Address View project details and contacts
City, State (County) Bloomington, IN 47404   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 1,271 feet of paved trail, 1,646 square yards of asphalt paving, 610 square yards of uncolored concrete sidewalks or path, and 127 square yards of textured col-ored concrete paving.• Reconstruction of approxi-mately 1,250’ of streambank with large quarry mill blocks in a did fi stepped or tiered configuration to provide permanent erosion protection.• All earthwork associated with trail construction to include approximately 1,400’ of linear grading for trail and ditch grad-ing, including an allowance forup to 100 cubic yards for the removal and replacement of un-suitable subgrade soils found.• All earthwork associated withstreambank stabilization, in-cluding approximately 2,700cubic yards of excavation which includes an allowance for up to815 CYS of rock excavation, re-moval of old concrete and stone walls and footers, and removal of stumps in the Base Bid.• Approximately 457’ of elevat-ed wooden boardwalk and a450 square foot viewing deck for the waterfall area built to ADA requirements.• Approximately 290’ of 18”culvert pipes and structures in-cluding cast in place concrete outlets.• Removal of one old composite concrete and metal bridge and replacement with a new prefab-ricated steel truss bridge mea-suring 40’ long with a 12’ clear deck width.• Planting of 115 new trees ofvarious species.• Installation of lighting includingBase Bid components of con-duits, conductors, handhole sand services points, and a Bid Alternate for poles, fixtures, and luminaires.• Resetting and partial replace-ment of limestone table and bench sets at three locations.• A Bid Alternate for Limestone gateway pedestals.• Other miscellaneous work described within the plans and specifications including mainte-nance of traffic, erosion control, tree protection and permanent mulched seeding or sodding ofall turf areas not otherwise oc-cupied by quarry block or pave-ments.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents