Similar Projects
Manitowish - Hurley Const / Resurface
Infrastructure
Conception
$750,000 CJ est. value
Manitowish Waters, WI 54545

Range Concrete Work
Infrastructure
Design
$80,000 CJ est. value
Boulder Junction, WI 54512

Saint Germain - Sayner
Infrastructure
Bidding
$3,000,000 CJ est. value
Saint Germain, WI 54558

Road Repairs
Infrastructure
Bidding
$300,000 CJ est. value
Land O Lakes, WI 54540

Forest Edge Apartments - LDF
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Lac du Flambeau, WI 54538

2022 Road Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Boulder Junction, WI 54512

Grind and Repave Camp Road
Infrastructure
Results
$60,878 CJ est. value
Eagle River, WI 54521

2023 CTH M Roadwork Marsh Lane to Center St.
Infrastructure
Results
$103,855 CJ est. value
Eagle River, WI 54521

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Lac Du Flambeau Band Of Lake Superior Chippewa Indians Request For Proposals For Resurfacing Of Multiple Driveways
Infrastructure
Post-Bid
$300,000 CJ est. value
Lac du Flambeau, WI 54538

King's Land O'Lakes Airport - Contract 2
Infrastructure
Results
$61,575 CJ est. value
Land O Lakes, WI 54540

Lakeview Circle Project
Infrastructure
Post-Bid
$110,000 CJ est. value
Phelps, WI 54554

Fire Department Well Replacement
Infrastructure
Results
$256,215 CJ est. value
Saint Germain, WI 54558

RFP D/B - Tribal Broadband Connectivity Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Lac du Flambeau, WI 54538

Last Updated 10/18/2023 07:32 PM
Project Title

Water Main & Service Line Leak Repairs

Physical Address View project details and contacts
City, State (County) Lac du Flambeau, WI 54538   (Vilas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $390,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Lac du Flambeau Reservation Water Main and Service Line Leak Repairs Site Directions: Location of existing water leak(s) is near Home 2712 Cemetery Rd., Lac du Flambeau, WI 54538. Est. Completion Date: Dec. 22, 2023 The work is to include the repair of water main and service leaks located near Home 2712 Cemetery Rd. The contractor is to provide all labor, materials, supplies, equipment, safety equipment and signage as required for performance of the work. Substantial Completion Date (repairs): 12/22/23 Final Completion Date (restoration): 6/14/24 The Lac du Flambeau Band is requesting bids from reputable water utility contractors capable of working on public water distribution systems. The identified water leak was located via a sound detection device placed on the curb stop box for Home 2712 Cemetery Rd. No water has ponded to the surface. The nearby area has sandy soils and potential elevated groundwater. The existing water system in this area was constructed in the late 1980's, early 1990's.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents