Similar Projects
Balboa Island Drainage MP/Pump Stations - City of Newport Beach
Infrastructure
Conception
$20,000,000 CJ est. value
Newport Beach, CA 92663

Zone 3 And 4 Pump Station Upgrades - 23WXX - City Of Newport Beach
Renovation
Conception
$1,784,000 CJ est. value
Newport Beach, CA 92625

Seal Beach Pump Station Rehabilitation / Replacement - Orange County Sanitation District
Renovation
Design
$57,000,000 CJ est. value
Fountain Valley, CA 92708

Reata Pump Station Rehabilitation - City of San Clemente
Renovation
Design
$2,800,000 CJ est. value
San Clemente, CA 92672

Elden Pump Station Emergency Bypass Replacement
Renovation
Bidding
$120,000 CJ est. value
Costa Mesa, CA 92626

Westbluff Pump Station Rehabilitation
Renovation
Bidding
$270,000 CJ est. value
Costa Mesa, CA 92627

Edinger Pump Station Replacement
Renovation
Post-Bid
Orange, CA 92866

Washington Well Improvements: Well Drilling (Phase I)
Infrastructure
Post-Bid
$3,340,000 CJ est. value
Santa Ana, CA 92701

McFadden Sewer Lift Station Replacement
New Construction
Results
$3,170,000 est. value
Huntington Beach, CA

Carbon Canyon Booster Pump Station No 3 Rehabilitation
Renovation
Results
Brea, CA

Lower Serrano Pump Station - 18225 - City of Orange
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Orange, CA 92861

Calle Real Pump Station Rehabilitation Phase II Pump Replacement - City of San Clemente
Renovation
Design
$4,400,000 CJ est. value
San Clemente, CA 92672

Well Maintenance and Repairs
Infrastructure
Bidding
$150,000 CJ est. value
Orange, CA 92866

Bay Bridge Pump Station and Force Main Replacement
Demolition, Renovation, Infrastructure
Post-Bid
$46,123,469 CJ est. value
Fountain Valley, CA 92708

Well 32 Rehabilitation Re-Bid
Infrastructure
Results
$12,045,735 CJ est. value
Santa Ana, CA 92706

Last Updated 05/08/2023 12:05 PM
Project Title

Blanco Pump Station Rehabilitation - City of San Clemente

Physical Address View project details and contacts
City, State (County) San Clemente, CA 92672   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected March 2021
Bids Due View project details and contacts
Estimated Value $2,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will rehabilitate the potable water pump station on Via Blanco that conveys water to Reservoir No. 9. The pump station is at the end of its useful life and is in need of rehabilitation. Based on the recommendations from a recent study, the pump station will be expanded to provide greater pumping capacity. The increased capacity will improve system performance based on the loss of a critical easement line. Project is included in the City of San Clemente FY 2021-2026 CIP. As of November 24, 2020, information regarding a general contractor is not available. Construction is not anticipated to begin before FY 2021.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents