Similar Projects
Substation Replacement
Results
Mohawk, NY 13407

Electrical Substation Upgrades - Raw Water and Clear Water Pumping Station
Results
Less than $8,500,000 est. value
Oswego, NY 13126

Design-Build Services for the Bergen Electrical Substation Project at John F. Kennedy International Airport
Post-Bid
Jamaica, NY

Substation Improvements
New Construction
Pending Verification
Rochester, NY 14623

US Ceiling Corp Office / Warehouse
New Construction
Pending Verification
Webster, NY 14580

Substation Upgrades
Post-Bid
Angelica, NY 14709

Saranac Digital Substation
Term Contract
Post-Bid
Cadyville, NY 12918

Preventative Maintenance of South Plant Electrical Substations
Results
Albany, NY 12207

Robert Moses Unit Substation Replacement
Post-Bid
Lewiston, NY 14092

Reported 08/28/2020 12:00 AM
Project Title

Z--528-16-101 Replace Switchgear B11 and B18

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14215   (Erie County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, tools, equipment, and supervision necessary for: Add 4160VAC ductbank extensions. Remove legacy 4160VAC ductbanks. Add a utility tunnel for 4160VAC feeders. Add electric manholes. Reroute existing facility utility mains. Remove and replace 480VAC and 208VAC ductbanks within Building 1 subbasement. Lease of temporary substation and switchgear equipment for use during construction process. Rerouting of 4160VAC distribution power to enable demolition and construction while maintaining facility operations. Removal and replacement of 4160VAC feeders. Full renovation and expansion of Building 11 including all associated sub systems (plumbing, mechanical, HVAC, insulation, electrical, etc ). Substations A, B, C, D, G, and H will be removed, replaced, relocated, and reconfigured within Building 11. Full demolition of Building 18. Full replacement of Building 9. Site restoration as required for the various work areas.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents