Similar Projects
York House Road Resurfacing
Infrastructure
Bidding
Libertyville, IL

14th Street Resurfacing
Infrastructure
Bidding
Libertyville, IL

2021 Patrol 1 Maintenance
Post-Bid
Libertyville, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

Precast Concrete Pavement and Class B Concrete Patches
Results
Buffalo Grove, Long Grove, Vernon Hills, IL 60089

Baker Road Water Main Replacement
Infrastructure
Bidding
$440,000 est. value
Waukegan, IL

Washington Street Resurfacing
Renovation
Post-Bid
IL

Designed Overlay, ADA Improvements
Results
Barrington, IL

2022 Watermain Replacement - Oak Terrace Water System and Oakwood Road Watermain
Renovation, Alteration
Bidding
$1,400,000 est. value
Waukegan, IL 60085

Class B Patching, Class D Patching, Crack Filling of a Concrete Roadway, Striping Replacement, Curb and GutterRemoval and Replacement
Post-Bid
IL 60089

Asphalt Pavement Services
Results
Round Lake, IL 60073

Special Service Area No. 13 Watermain Extension
New Construction, Renovation
Bidding
Green Oaks, IL 60048

Il Route 43 At Westleigh Road Intersection
Term Contract
Post-Bid
Lake Forest, IL 60045

2020 Joint Pavement Patching
Results
Libertyville, IL 60048

Last Updated 01/31/2022 06:31 AM
Project Title

Pulverization of The Existing Pavement and the Construction of Hot-Mix Asphalt Binder and Surface Courses

Physical Address View project details and contacts
City, State (County) Libertyville, IL   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $137,064
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the Pulverization of the existing pavement and the construction of Hot-Mix Asphalt Binder and Surface Courses. Traffic Control and Protection for the work zone is also required. Major pay items include 570 ton Hot-Mix Asphalt Binder Course, IL-19.0, N50; 570 ton Hot-Mix Asphalt Surface Course, IL-9.5, Mix "D", N50; 4,622 square yards Pulverization; 11,440 pounds Bituminous Materials (Prime Coat) and 1 lump sum Traffic Control and Protection.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents