Similar Projects
The Village at Loretto Heights
New Construction, Renovation
Conception
Denver, CO 80236

UC Boulder Masterplan
New Construction, Renovation
Conception
Boulder, CO 80309

Standing Order Contractor Program
Bidding
Less than $50,000 est. value
Boulder, CO 80303

Notice #19-25-Pr010107/Hsg11132-Aden & Brkt-Maint
Renovation
Post-Bid
$750,000 est. value
Boulder, CO 80303

Notice #19-27-Cp272988-Seel Rm 185C Cosinc Chr Lab Renovatio
Renovation
Post-Bid
Less than $600,000 est. value
Boulder, CO 80303

Cu Boulder Mse/Rasei Suite Renovation
Renovation - 8,425 SF
Results
Less than $1,000,000 est. value
Boulder, CO 80303

Research Complex 2 - 11th Floor Renovate Rooms P15- 11450D, P15-11232 and P15-11243
Renovation
Results
$105,000 to $115,000 est. value
Aurora, CO

LCC20-05 MAP Center Remodel
Renovation
Construction
$130,000 est. value
Lamar, CO 81052

LCC 20-07 Proj #01-2019 Student Union Remodel
Renovation
Construction
$350,000 est. value
Lamar, CO 81052

Notice #19-32-Pr01026/Hsg11122-C4c-Ofc Suite Renovations
Renovation
Post-Bid
Less than $650,000 est. value
Boulder, CO

Mines Innovation Hub
Results
$14,300,000 est. value
Golden, CO

Notice 19-26-SLL(NPL)-FS-SwtchGr-Lab Reno Projects
Renovation
Construction
$1,500,000 est. value
Boulder, CO 80309

Cu Anschutz Pn20-125493
Renovation
Post-Bid
Less than $3,078,000 est. value
Denver, CO

Gunter Renovation for Nursing Simulation Labs 2090, 2130
Renovation
Results
Less than $450,000 est. value
Greeley, CO 80639

Wellness Center 2nd Floor Addition
Renovation, Addition
Construction
$650,000 est. value
Golden, CO 80401

Last Updated 02/05/2020 10:16 AM
Project Title

ISL Building Exterior Repair

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80523   (Larimer County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of all existing exterior glazing and associated clerestory ventilation system. The reinstallation of the glazing system requires additional framing and steel components to accommodate new windows and address additional height of added roof insulation at clerestory level

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents