Similar Projects
US 101/Schaerer Creek to Hood Canal - Remove Fish Barrier
Infrastructure
Conception
$2,661,000 CJ est. value
Cosmopolis, WA 98537

US 101/Schaerer Creek to Hood Canal - Remove Fish Barrier
Infrastructure
Conception
$2,661,000 CJ est. value
Cosmopolis, WA 98537

US 12/Satsop River Bridge EB - Bridge Painting
Renovation, Infrastructure
Design
$4,410,000 CJ est. value
Aberdeen, WA 98520

SR 109/N of Moclips Highway - Stabilize Slope
Infrastructure
Design
$1,824,000 CJ est. value
Hoquiam, WA 98550

US 101 / SR 105 / SR 105 Spur Aberdeen/Westport Signals and ADA
Infrastructure
Bidding
$1,000,000 CJ est. value
Aberdeen, WA 98520

RFP Construction Manager - Summit Pacific Medical Center (SPMC) Hospital Expansion Project
Addition, Demolition, Build-out, Infrastructure
Bidding
$27,500,000 CJ est. value
Elma, WA 98541

Lower Satsop Right Bank Conservation
Infrastructure
Post-Bid
Montesano, WA

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Miller Junior High School Site Preparation for Covered Area
Infrastructure
Results
Aberdeen, WA 98520

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

SR 105/S of Fairmount Ave - Culvert Replacement
Infrastructure
Conception
$2,945,000 CJ est. value
Aberdeen, WA 98520

SR 105/W Harriman St Signal - Roundabout
Infrastructure
Design
$1,000,000 CJ est. value
Aberdeen, WA 98520

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Northeast Neighborhood Development Phase One
Infrastructure
Results
$11,881,570 CJ est. value
Aberdeen, WA 98520

SR 105 / Washaway Beach Vicinity - Slope Protection
Infrastructure
Design
$797,000 CJ est. value
Grayland, WA 98547

Last Updated 10/20/2022 04:32 AM
Project Title

US 101/Chicken Coop Creek - Remove Fish Barrier

Physical Address View project details and contacts
City, State (County) Cosmopolis, WA 98537   (Grays Harbor County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,472,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID 310161D-05 This 3-foot by 4-foot concrete box culvert is a migratory fish barrier. This project will replace the existing box culvert with a three-sided bottomless culvert and realign the creek channel. When complete, this migratory fish passage barrier will be eliminated and sediment deposition reduced. As of October 20, 2022, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be completed in the third quarter of 2023. The contract advertisement is expected in fourth quarter of 2022 and construction is anticipated to be operationally complete in the third quarter of 2024. WSDOT - US 101/Chicken Coop Creek - Remove Fish Barrier *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents