Similar Projects
2022 Bond - Bellingham School District
New Construction, Renovation, Infrastructure
Conception
$122,000,000 CJ est. value
Bellingham, WA 98225

SR 539/Bay-Lyn Dr to International Boundary - Corridor Improvements
Infrastructure
Conception
$27,000,000 CJ est. value
Lynden, WA 98264

D/B - GSA LPOE Pacific Highway, WA. Lane Expansion Project
Infrastructure
Design
$20,000,000 est. value
Blaine, WA 98230

I-5/Squalicum Creek to SR 539 - Bridge Deck Overlays
Infrastructure, Renovation
Design
$989,000 CJ est. value
Bellingham, WA 98229

Hundred Acre Wood Phase 1 RFQ
Infrastructure
Bidding
$1,000,000 CJ est. value
Bellingham, WA 98225

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Station 81 Site Preparation
Infrastructure
Post-Bid
Everson, WA 98247

Industrial Condensate Pipeline Outfall
Infrastructure
Results
$2,800,000 est. value
Lynden, WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

The Millworks Project Phase I
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Bellingham, WA 98225

Home Road Multifamily
New Construction, Infrastructure
Pending Verification
$36,000,000 CJ est. value
Bellingham, WA 98225

Bellingham Bay Community Boating Center
New Construction, Infrastructure - 1,236 SF
Pending Verification
$300,000 CJ est. value
Bellingham, WA 98225

Tromp Road - City of Lynden
Infrastructure
Conception
$1,000,000 CJ est. value
Lynden, WA 98264

I-5/Slater Road Interchange - Improvements
Infrastructure
Design
$13,661,000 CJ est. value
Bellingham, WA 98229

RFP - Boardmill Redevelopment Opportunity
New Construction, Infrastructure - 44,000 SF
Post-Bid
$1,500,000 CJ est. value
Bellingham, WA 98225

Last Updated 04/24/2023 04:03 AM
Project Title

SR 539 Duffner Ditch Fish Passage

Physical Address View project details and contacts
City, State (County) Lynden, WA 98264   (Whatcom County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,719,678 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installing a box culvert, grading, stream alignment, storm sewer realignment, existing culvert slip lining, hot mix asphalt paving, pavement marking, guardrail, erosion control, planting, cable vault, fiber optic cable, fiber testing, traffic control and other work. Involves 86 items and 47 Working days. Work class 1 or 6. Estimated value $1,500,000 - $2,000,000 This is a Federally funded contract with a 16% disadvantaged business enterprise goal. WSDOT - SR 539/Duffner Ditch - Fish Passage The Engineer assigned to answer questions regarding these bid documents, show this project to prospective bidders, and act as the Contracting Agencys representative who directly supervises the engineering and administration of this project is: Melissa Ambler, P.E. 460 Stuart Road Bellingham, WA 98226 (360) 788-7406

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents