Similar Projects
Last Updated 06/18/2021 09:12 AM
Project Title

Woonsocket Reservoir No. 1 Dam Improvements

Physical Address View project details and contacts
City, State (County) Lincoln, North Smithfield, RI   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 04/20/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Work on the Woonsocket Reservoir No. 1 Dam consists of the following: 1. Perform selective tree and brush clearing 2. Removing and replacing the existing reinforced concrete overlay at the primary spillway steps and training walls. 3. Power washing and completing crack repairs at the primary spillway scour pad. 4. Install a toe drain extension and clean-out. 5. Clean the toe drain and 30-inch intake of accumulated debris.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents