Similar Projects
Goraleigh Chiller
Bidding
Raleigh, NC

Security, Lighting, and HVAC Controls
Post-Bid
Raleigh, NC

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

Chiller and Air Handler
Results
Less than $33,739 est. value
Raleigh, NC

Bard Wall Mount Heat Pump - 3.5 Ton
Results
Less than $55,860 est. value
NC

Air Conditioning Equipment
Post-Bid
Raleigh, NC 27603

Bard Wall Mount Heat Pump - 3 Ton
Results
Less than $33,190 est. value
Raleigh, NC

Heating and Air Equipment
Post-Bid
Raleigh, NC 27603

Chiller Replacement - Lee Hall
Results
Less than $600,000 est. value
Raleigh, NC

Pullen Aquatic Center HVAC Improvements
Post-Bid
Raleigh, NC 27606

Replace Chilled Water Coils
Results
Less than $130,347 est. value
Raleigh, NC 27601

DPS - Morrison Aggrey Dorm Heating System Replacement
Post-Bid
Raleigh, NC 27699

HVAC Equipment at North Carolina State Lab of Public Health
Term Contract
Results
Less than $15,986 est. value
Raleigh, NC 27607

Century Station Air Cooled Chiller Replacement
Post-Bid
$25,000 to $100,000 est. value
Raleigh, NC 27601

Fuquay Varina Middle School Chiller Replacement
Results
Fuquay-Varina, NC 27526

Reported 09/26/2020 12:00 AM
Project Title

Cooling Tower Water Treatment at Raleigh`s Performing Arts Center

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27602   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the sampling and water treatment service is to eliminate unscheduled down time, extend the service life of the equipment, reduce operating costs and to provide predictable pricing for trouble shooting and repair service calls. The cooling towers are two separate systems and they are cleaned twice a year. The cooling towers are 15 years old and in good condition. There are no leaks. The system water volume for each tower is 1500 GPM. Water recirculation flow rates for each cooling tower is 900 GPM. The Delta-T values for each tower are 7. The average yearly water makeup demand is 1500 gallons. The average monthly hours the chillers run at load is 75%.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents