Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

2022 Chip and Seal Repairs
Infrastructure
Bidding
$169,100 est. value
Mogadore, OH

Gilchrist Road - Four Lane Resurfacing
Infrastructure
Bidding
$592,448 est. value
Akron, OH 44325

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Major Reconstruction - SR 8/IR 76/IR 77-00.63/09.74/08.42
Results
Akron, OH 44301

Fairlawn Corporate Parkway Extension
Results
Less than $555,000 est. value
Fairlawn, OH

SR 241/SR 764 - Four Lane Resurfacing
Infrastructure
Bidding
$3,275,000 est. value
Akron, OH 44306

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

2021 Asphalt Resurfacing and Patching Program
Results
$3,159,012 est. value
Hudson, OH

Sunrise East Blvd., West Ave., and Pearl Ave. Infrastructure Improvements
Infrastructure
Bidding
$1,762,000 est. value
Mogadore, OH

Corporate Woods Circle/Boettler Road
Infrastructure
Post-Bid
$6,077,914 est. value
Green, OH 44685

Brandywine Road Phase 1
Results
$521,391 est. value
Boston Heights, OH

Ravenna Road Resurfacing Part 1
Infrastructure
Post-Bid
$956,257 est. value
Akron, OH

Restoration of Pavement for Utility Repair Excavations
Results
$199,995 est. value
Cuyahoga Falls, OH

Last Updated 06/01/2022 10:45 PM
Project Title

Beardsley Street Improvements

Physical Address View project details and contacts
City, State (County) Akron, OH 44325   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $280,958 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Design-Build project on Beardsley Street from North Firestone Blvd to Archwood Ave includes new asphalt resurfacing approximately 1.5 thick, new curb and underdrain, new inlets, new sidewalk and adjacent topsoil, new curb ramps if directed, new concrete aprons, new pull boxes if necessary, reconnecting street lighting amenities, new street signs and traffic signs. Additionally, the entirety of the storm sewer system within the limits shall be replaced, this includes all inlet leads.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents