Last Updated | 08/14/2023 11:29 AM |
Project Title | HVAC System Replacement |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53715 (Dane County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2026 |
Bids Due | View project details and contacts |
Estimated Value | $2,214,687 [brand] Estimate |
Plans Available from | MEP Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the work consists of replacing the antiquated HVAC system in the South Wing of Bascom Hall. The new system will be four-pipe fan coil units with ventilation air from a central energy recovery unit that will reuse some existing distribution ductwork to each floor. The new system will connect to central campus chilled water and steam/condensate via a hot water distribution system. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Performance Bond: 100% Payment Bond: 100% Prevailing Wage Requirement: Yes The successful mechanical, electrical, plumbing, or fire protection Bidder must agree to commence the work on or before a date to be specified in a written "Notice to Proceed" issued by the General Prime Contractor and to fully complete all the work within 365 consecutive calendar days thereafter. Bid - Result FIRE PROTECTION Automatic Fire Systems, Inc : $ 99,813.00 HVAC North American Mechanical, Inc. : $ 1,896,800.00 ELECTRICAL Forward Electric, Inc. : $ 218,074.00 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |