Similar Projects
Air Filtration Installation
Alteration
Post-Bid
$133,000 est. value
Sun Prairie, WI

Cottage 7 HVAC Air Compressor Maintenace and Repair Services
Alteration
Post-Bid
Madison, WI

Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Results
$1,247,800 est. value
Madison, WI 53704

Environmental Health and Safety Central Utility Connections - GPC
Alteration
Results
$1,350,000 est. value
Madison, WI 53715

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Removal and Replacement of Air Conditioning Units
Alteration
Post-Bid
Madison, WI 53704

SEG-HSU Water Heater Replacement
Renovation
Results
$198,243 CJ est. value
Madison, WI 53715

Heat Pump Replacements
Alteration
Post-Bid
$623,000 est. value
Sun Prairie, WI 53590

2021 HVAC Improvements Project
Renovation
Results
$1,994,000 CJ est. value
Madison, WI 53713

Fitchburg Community Center Boiler Replacements
Renovation
Post-Bid
$500,000 CJ est. value
Fitchburg, WI 53711

Middleton City Hall HVAC Control Replacement
Renovation
Results
$86,520 CJ est. value
Middleton, WI 53562

HVAC System Renovation Chancellors Hall - UW Eau Claire
Renovation
Post-Bid
$1,136,500 CJ est. value
Madison, WI 53715

Boiler Replacement - MEP
Renovation
Results
$233,621 CJ est. value
Madison, WI 53715

Lakeside Boiler Replacement Cottage A - Mendota Mental Health Institute
Renovation
Results
$257,405 CJ est. value
Madison, WI 53704

A Tower Ventilation Renovation Witte Residence Hall MEP
Renovation
Results
$1,958,124 CJ est. value
Madison, WI 53706

Last Updated 08/14/2023 11:29 AM
Project Title

HVAC System Replacement

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2026
Bids Due View project details and contacts
Estimated Value $2,214,687 [brand] Estimate
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of replacing the antiquated HVAC system in the South Wing of Bascom Hall. The new system will be four-pipe fan coil units with ventilation air from a central energy recovery unit that will reuse some existing distribution ductwork to each floor. The new system will connect to central campus chilled water and steam/condensate via a hot water distribution system. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Performance Bond: 100% Payment Bond: 100% Prevailing Wage Requirement: Yes The successful mechanical, electrical, plumbing, or fire protection Bidder must agree to commence the work on or before a date to be specified in a written "Notice to Proceed" issued by the General Prime Contractor and to fully complete all the work within 365 consecutive calendar days thereafter. Bid - Result FIRE PROTECTION Automatic Fire Systems, Inc : $ 99,813.00 HVAC North American Mechanical, Inc. : $ 1,896,800.00 ELECTRICAL Forward Electric, Inc. : $ 218,074.00

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents