Similar Projects
Payson 6,8,10 Mechanical Rooms Upgrades
Post-Bid
Payson, UT

Alpine School District - HVAC Air Filters and Delivery
Term Contract
Post-Bid
Lindon, UT 84042

S--PAO & PGMB Facility Maintenance
Results
Pleasant Grove, UT

Alpine School District Large Commercial HVAC System Installation, Maintenance, and Repair Services
Results
Alpine, UT

Payson 6, 8, 10
Construction
$498,800 est. value
Payson, UT 84651

Grove Park 5, 6 Vineyard 1 & 2 - HVAC
Renovation
Construction
$450,000 est. value
Orem, UT 84057

Alpine School District Small Commercial HVAC System Installation, Maintenance, and Repair Services
Term Contract
Results
Alpine, UT

DFCM Construction-Pre-Qualified Mechanical Contractors-Aspen Complex Controls Upgrade
Results
Less than $180,000 est. value
American Fork, UT

Public Safety Condensing Units and Boilers
Results
Less than $110,000 est. value
Orem, UT

DFCM Construction-Pre-Qualified Mechanical Contractors-Provo Regional Chiller Upgrades
Results
Less than $758,000 est. value
Provo, UT 84606

Eagle Crest and Foothill Elementary Schools ATC Upgrade
Results
Lehi, UT 84043

Highland Elementary School Chiller Replacement
Results
Highland, UT 84003

DFCM Construction - Pre-Qualified Mechanical - UVU LA and CS AHU Upgrades
Results
Less than $1,185,000 est. value
Orem, UT 84058

DFCM Construction-Pre-Qual Mechanical-Uvu Campus Domestic Water Loop Upgrade
Results
$333,000 est. value
Orem, UT

DFCM Construction - Payson Va Kitchen, Laundry and HVAC Upgrades - Department of Veterans Affairs
Results
Less than $167,000 est. value
Payson, UT 84651

Last Updated 02/01/2019 02:55 PM
Project Title

Spring Creek Elementary Chiller Replacement

Physical Address View project details and contacts
City, State (County) Provo, UT   (Utah County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project consists of the following: Removal and replacement of an existing air-cooled chiller. Removal and replacement of existing chilled water pump motors. Addition of variable frequency drives (VFD) to existing chilled water pumps. Demolition, modification, and addition of piping chilled water piping. Removal and replacement of existing triple duty valves at existing chilled water pumps. All electrical power demolition, modification, and addition associated with the mechanical equipment scope of work identified within the construction documents.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents