Similar Projects
Baseline Road Trailhead Improvements - PRC202007 - County of Marion
Infrastructure
Conception
$825,000 CJ est. value
Ocala, FL 34472

Ray Wayside Site Improvements - PRC202006 - County of Marion
Renovation, Infrastructure
Conception
$899,801 CJ est. value
Silver Springs, FL 34488

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Design
$300,000 CJ est. value
Ocala, FL 34475

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Design
$300,000 CJ est. value
Ocala, FL 34475

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Rolling Hills Unit 5 Road Improvement Project
Infrastructure
Results
$200,000 est. value
Ocala, FL 34481

SE 150th St/SE 25th Ave Resurfacing (from CR 475 to CR 484)
Infrastructure
Results
$528,000 est. value
Summerfield, FL 34491

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Watermark / Summerfield
New Construction, Infrastructure - 79,000 SF
Pending Verification
$143,100,000 CJ est. value
Summerfield, FL 34491

Watermark / Summerfield
New Construction, Infrastructure - 79,000 SF
Pending Verification
$143,100,000 CJ est. value
Summerfield, FL 34491

Southwest 49th/40th Avenue Phase 1 - County of Marion
Infrastructure
Conception
$6,800,000 CJ est. value
Ocala, FL 34474

Murphy USA #7128 / Ocala
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Ocala, FL 34471

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

SW 80th Street Reclamation (SW 60th Avenue to SW 38th Avenue)
Infrastructure
Results
$875,000 est. value
Ocala, FL 34476

Last Updated 07/18/2023 05:36 AM
Project Title

SW 49th Ave North Phase Road Project - Demolition

Physical Address View project details and contacts
City, State (County) Ocala, FL 34476   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $15,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

LAST DAY FOR QUESTIONS: June 7, 2023, 12:00 PM For questions relating to this solicitation, contact: Anette Francia | anette.francia@marionfl.org The Office of the County Engineer is seeking quotes for the demolition of one (1) structure. Demolition and removal, per the scope of work. This includes materials, equipment, labor, and all costs associated with the work. No additional fees will be allowed. Property Site Inspections: It is recommended that the Contractor visit and inspect the property before submitting a Quote. 2. Contractor must remove all of the structure using a wet demo method, remove the underbrush, and rough grade the site upon completion. 3. Contractor must cap and abandon wells following the state regulations on proper well abandonment; permanently abandon, remove the septic tank(s), and fill with clean sand or suitable material and rough grade upon completion. 4. Removal includes slab(s), driveway(s), all junk, litter, and unserviceable vehicles when applicable. The driveway(s) connection to the public right of way shall be left intact to protect the edge of the asphalt. Typically, a minimum of at least one section of a concrete driveways and/or at a minimum of 10 from edge of pavement. This will be determined at the pre-con meeting. Contractor shall have exclusive salvage rights. Any towing fees/expenses (cost of removal, transportation, storage, incidental damages, etc.) associated with the removal of any unserviceable vehicle(s) shall not be the financial responsibility of the County. In accordance with Florida Statutes (713.78), fees/expenses associated with the removal of any unserviceable vehicle(s) may be billed directly to the registered owner of the vehicle(s)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents