Similar Projects
Prattsburgh Wind Farm
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Avoca, NY 14809

NY 54A Wall Slope and Culvert Repairs
New Construction, Infrastructure
Design
$1,750,000 est. value
Hammondsport, NY 14840

Rehabilitation Two Bridges, I-86
Infrastructure
Bidding
$3,750,000 CJ est. value
Campbell, NY 14821

FEMA Drainage Improvements, NY 54A
Infrastructure
Bidding
$25,000,000 CJ est. value
Hammondsport, NY 14840

Campbell-Savona CSD 2020 Capital Project - Phase II
Renovation
Post-Bid
Campbell, Savona, NY 14821

Pinnacle Tower Site Development
Infrastructure
Post-Bid
$150,000 est. value
Bath, NY

Prattsburgh CSD Capital Improvements Project 2020 - Phase 2
Renovation
Results
Prattsburgh, NY 14873

Wayland-Cohocton CSD 2021 Capital Improvement Project
Renovation - 372,715 SF
Results
$11,518,000 est. value
Cohocton, Wayland, NY 14572

Arkport CSD 2019 Capital Improvement Project
Renovation
Construction
Arkport, NY 14807

Canisteo-Greenwood CSD 2018 Capital Improvements Project Phase 2
Renovation
Construction
Canisteo, NY 14823

Bridge Repair
Infrastructure
Bidding
$2,850,000 CJ est. value
Corning, NY 14830

Civil Defense Training Addition and New Parking Lot
Addition, Demolition, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Bath, NY 14810

Water District #1 Extension #1
Infrastructure
Results
$1,279,000 CJ est. value
Campbell, NY 14821

Campbell-Savona CSD 2020 Capital Project - Phase 1
Renovation
Construction
Less than $14,800,000 est. value
Campbell, NY

Mechanical Backup Well Project - Contract 1
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Cohocton, NY 14826

Last Updated 01/09/2023 12:06 PM
Project Title

2022 Frederick Carder Additions and Alterations

Physical Address View project details and contacts
City, State (County) Corning, NY 14830   (Steuben County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status All Submissions Received, Selection Underway, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed bids, in Triplicate, are sought and requested by the Corning - Painted Post Area School District (hereinafter called Owner), for the construction of the following Project: 2022 Frederick Carder Additions and Alterations Bids are requested for multiple prime contracts for General Trades Work, HVAC Work, Electrical Work, and Plumbing Work, in accordance with Drawings, Project Manual, and other Bidding and Contract Documents prepared by Hunt Engineers, Architects, Land Surveyors & Landscape Architect, DPC 100 Hunt Center, Airport Corporate Park, Horseheads, NY 14845 All questions prior to bid opening must be received by the close of business on December 12, 2022. Questions shall be directed to Construction Manager Troy Westlake at email twestlake@buildwelliver.com, and CC Jacob Zurlick at Hunt Engineers, Architects, Land Surveyors & Landscape Architect, DPC at email zurlickj@hunt-eas.com. All bidders request for information shall use the form located in specification 00 12 00 - Request for Information. A digital copy of this form is available upon request. As bid security, each Bid shall be accompanied by a certified check or Bid Bond made payable to Owner, in accordance with the amounts and terms described in the INSTRUCTIONS TO BIDDERS. The Owner requires that all bids shall comply with the bidding requirements specified in the INSTRUCTIONS TO BIDDERS. The Owner may, at his discretion, waive informalities in bids, but is not obligated to do so, nor does this represent that he will do so. The Owner also reserves the right to reject any and all bids. Under no circumstances will the Owner waive any informality which, by such waiver, would give one Bidder a substantial advantage or benefit not enjoyed by all other Bidders. No Bidder may withdraw his Bid before forty-five (45) days after the actual date of the opening thereof, unless a mistake due to error is claimed by the Bidder in accordance with INSTRUCTIONS TO BIDDERS. Attention of Bidders is particularly called to requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents