Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

Department of Corrections Marquette Branch Prison Kitchen Cooler / Freezer
Renovation
Sub-Bidding
$125,000 CJ est. value
Marquette, MI 49855

HVAC for Bus Wash Project
Alteration
Post-Bid
Clinton, MI

HVAC Improvements
Alteration
Post-Bid
$380,000 est. value
Leslie, MI 49251

Upgrade to Potable Water Risers Construction
Alteration
Results
$1,000,000 to $5,000,000 est. value
Iron Mountain, MI 49801

HVAC Renovations - Air Conditioning
Alteration
Results
Alma, MI 48801

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

Auburn Hills DPW Office HVAC Renovations
Alteration
Post-Bid
$200,000 est. value
Auburn Hills, MI 48326

IT Room HVAC Upgrades
Alteration
Results
Warren, MI 48089

HVAC Preventative Maintenance/Service Work and Building Management System Support
Term Contract
Post-Bid
Macomb, MI

Air Filters
Alteration
Results
Sterling Heights, MI

Arts Academy in the Woods - HVAC Renovations
Alteration
Post-Bid
$500,000 est. value
Fraser, MI 48026

2022 Ventilation Equipment Package
Alteration
Results
Warren, MI 48089

Community Center Gym HVAC Replacement
Alteration
Post-Bid
$500,000 est. value
Bay City, MI 48706

Repair/Refurbish Vilter Ammonia Compressor 450Xl
Alteration
Results
Farmington Hills, MI

Last Updated 09/21/2023 04:35 AM
Project Title

HVAC Replacement City of Fenton

Physical Address View project details and contacts
City, State (County) Fenton, MI 48430   (Genesee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000327618 The City of Fenton is seeking bids to replace two HVAC RTU units at the Fenton Water Treatment Plant. See attached bid document for full project description. Delivery Point 15300 North Road Fenton MI 48430 Question Acceptance Deadline 08/30/2023 03:00 PM EDT Questions are submitted online No Questions regarding the bid documents, work scope or project worksite can be directed to Dan Brisson, Public Works Director via email dbrisson@cityoffenton.org or phone 810-629-2261. *The City reserves the right to reject any or all bids, in part or in their entirety, or to waive any informality or defect in any bid, or to accept any bid which, in its opinion is deemed most advantageous to the City. 1. Furnish and install one (1) RTU unit, Rheem Model # RGECZR060ADU12BACAE1, Identified as RTU-1, Office Area. See attachment A for additional information 2. Furnish and install one (1) RTU unit, Rheem Model # RGECZR060ADU12BCCNE1, Identified as RTU-2, Laboratory. See attachment A for additional information. 3. Furnish and install one (1) Rheem RHC-ZNS4 Humidity Sensor for RTU-2 unit. See attachment A for additional information. 4. Furnish and install two programmable (7 day/1 event) thermostats. Existing "Nest" thermostats to be returned to the city. 5. Environmentally reclaim existing unit's refrigerant and properly dispose of. 6. Disconnect, remove and properly dispose ofthe two existing RTU units. 7. Provide all associated rigging to remove existing RTU units and install new units on the roof. 8. Perform any curb/foundation repairs or updates in preparation ofthe new RTU Units. Note the city plans to rehabilitate the roofwith a new rubber membrane layer in the near future. 9. Furnish and install new pads, whips and disconnects if needed to meet current electrical standards. 10. Furnish and install all necessary electrical equipment, conduit, wiring for equipment. 11. Furnish and install all necessary gas parts, fittings, materials for connection to new equipment. 12. Provide start-up of all equipment and verify proper operation, where system is a turn-key solution

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents