Similar Projects
Regional Biocontainment Lab HVAC Upgrades
Renovation
Sub-Bidding
$200,000 CJ est. value
Memphis, TN 38126

Commercial Quality Heating Cooling Parts and Supplies
Term Contract
Sub-Bidding
Memphis, TN 38103

Boiler Facility DA Tank Alarms and Level Controls
Post-Bid
Memphis, TN 38104

Public Works Shop Building Heating and Ventilation Unit
Post-Bid
Arlington, TN 38002

Fogelman Executive Building Upgrades HVAC Controls
Results
Memphis, TN 38152

Aerator Maintenance
Term Contract
Results
Memphis, TN 37501

Clement, Mitchell, and Theatre HVAC Updates
Construction
$6,440,000 est. value
Memphis, TN

United States Postal Service - HVAC Upgrades
Post-Bid
Less than $6,400,000 est. value
Memphis, TN 38136

Pink Palace Museum-HVAC
Results
$580,000 est. value
Memphis, TN 38111

HVAC Installations at West Collierville Middle School
Post-Bid
Collierville, TN 38017

Kingsbury Middle School/High School HVAC Replacement
Term Contract
Results
Memphis, TN 38122

Chiller Maintenance Services
Term Contract
Post-Bid
Memphis, TN 38103

East Shelby Library HVAC Control System and Components
Results
Memphis, TN 38125

SCS Mobile HVAC and Lift Equipment
Alteration
Post-Bid
Memphis, TN 38122

Holt Police Training Academy HVAC
Results
Memphis, TN 38127

Last Updated 09/02/2022 07:36 AM
Project Title

Snowden K8 and White Station High School - HVAC Replacements

Physical Address View project details and contacts
City, State (County) Memphis, TN 38103   (Shelby County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $815,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Shelby County Board of Education will accept written proposals for: IFB #09062022AW Snowden K8 & White Station HS - HVAC Replacements. Special Instructions: A mandatory pre-bid meeting is scheduled for this project, any vendors wanting to bid on any portion of this project must attend this meeting, no exceptions. All respondents are required to sign-in at the School''s Main Office at the stated date, time and location listed below. MSCS is requiring all Bidders to wear appropriate PPE gear (mask) during all Pre-Bid meetings, Site Visits and any other gatherings during this time period in order to promote a safe and healthy working environment for both employees and perspective bidders. Visit our website for additional information. Questions or requests for clarification of technical issues and terms pertaining to this Bid must be submitted in writing via e-mail to Ashley Washington at washingtonap@scsk12.org or LaJuanna Jones-Sulton at jonessultonlm@scsk12.org, by August 25, 2022 @ 2:00 PM CST SCBE has set a Minority or Woman-owned Business Enterprises goal for Snowden K8 10.2% and WhiteStation HS 13.4% for this project Snowden: Engage/employ A/E services to design/build the replacement ALL hydronic piping from Hot and Chilled Water Plants to ALL terminal HVAC equipment. Piping product will be NIRON CLIMA PP-RCT PIPE - SDR 11 SERIES or approved equal. Project will be in accordance with MSCS Design Planning Principles and Construction Guidelines, latest edition; and compliant with all applicable codes and AHJs. Alternates: 1. Replace the east hot and chilled water systems including but not limited to the boilers, chiller, pumps, valves, actuators, etc. This will include new stand alone, web-based BAS controls for all new equipment; and commissioning. 2. Replace the west hot water system, including but not limited to the boilers, pumps, valves, actuators, etc. This will include new stand alone, web based BAS controls for all new equipment; and commissioning. 3. Replace all RTUs and terminal units (USs & FCUs), all HVAC equipment. This will include new stand alone, web-based BAS controls for all new equipment; and commissioning. 4. Provide a unit cost to replace one (1) ceiling mounted fan coil unit. If executed, this will connect to the existing BAS. WhiteStation HS Engage/employ A/E services to design/build the following for WhiteStation HS - 2780-HVAC-Replace HW systems (2-main and east), including but not limited to boilers, pumps, piping modifications, valves, actuators, as needed for quality installation, operation and long-term affect. Convert steam to hot water. Project will be in accordance with MSCS Design Planning Principles and Construction Guidelines, latest edition; and compliant with all applicable codes and AHJs. Alternates: 1. Replace hot and chilled water systems in the north plant (near round gym) including but not limited to boiler(s), chillers, pumps, valve actuators, piping modifications, and accessories. 2. Replace library air-handling unit, and air compressor, hw & cw pumps, control valves in the north mechanical room next to the round gym. Provide new controls as needed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents