Similar Projects
Last Updated | 09/02/2022 07:36 AM |
Project Title | Snowden K8 and White Station High School - HVAC Replacements |
Physical Address | View project details and contacts |
City, State (County) | Memphis, TN 38103 (Shelby County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $815,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Shelby County Board of Education will accept written proposals for: IFB #09062022AW Snowden K8 & White Station HS - HVAC Replacements. Special Instructions: A mandatory pre-bid meeting is scheduled for this project, any vendors wanting to bid on any portion of this project must attend this meeting, no exceptions. All respondents are required to sign-in at the School''s Main Office at the stated date, time and location listed below. MSCS is requiring all Bidders to wear appropriate PPE gear (mask) during all Pre-Bid meetings, Site Visits and any other gatherings during this time period in order to promote a safe and healthy working environment for both employees and perspective bidders. Visit our website for additional information. Questions or requests for clarification of technical issues and terms pertaining to this Bid must be submitted in writing via e-mail to Ashley Washington at washingtonap@scsk12.org or LaJuanna Jones-Sulton at jonessultonlm@scsk12.org, by August 25, 2022 @ 2:00 PM CST SCBE has set a Minority or Woman-owned Business Enterprises goal for Snowden K8 10.2% and WhiteStation HS 13.4% for this project Snowden: Engage/employ A/E services to design/build the replacement ALL hydronic piping from Hot and Chilled Water Plants to ALL terminal HVAC equipment. Piping product will be NIRON CLIMA PP-RCT PIPE - SDR 11 SERIES or approved equal. Project will be in accordance with MSCS Design Planning Principles and Construction Guidelines, latest edition; and compliant with all applicable codes and AHJs. Alternates: 1. Replace the east hot and chilled water systems including but not limited to the boilers, chiller, pumps, valves, actuators, etc. This will include new stand alone, web-based BAS controls for all new equipment; and commissioning. 2. Replace the west hot water system, including but not limited to the boilers, pumps, valves, actuators, etc. This will include new stand alone, web based BAS controls for all new equipment; and commissioning. 3. Replace all RTUs and terminal units (USs & FCUs), all HVAC equipment. This will include new stand alone, web-based BAS controls for all new equipment; and commissioning. 4. Provide a unit cost to replace one (1) ceiling mounted fan coil unit. If executed, this will connect to the existing BAS. WhiteStation HS Engage/employ A/E services to design/build the following for WhiteStation HS - 2780-HVAC-Replace HW systems (2-main and east), including but not limited to boilers, pumps, piping modifications, valves, actuators, as needed for quality installation, operation and long-term affect. Convert steam to hot water. Project will be in accordance with MSCS Design Planning Principles and Construction Guidelines, latest edition; and compliant with all applicable codes and AHJs. Alternates: 1. Replace hot and chilled water systems in the north plant (near round gym) including but not limited to boiler(s), chillers, pumps, valve actuators, piping modifications, and accessories. 2. Replace library air-handling unit, and air compressor, hw & cw pumps, control valves in the north mechanical room next to the round gym. Provide new controls as needed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |